大跨隧道穿越高层建筑物桩基托换设计及优化
王莉平
Design and Optimization of Pile Foundation Underpinning of High Building Where Long-span Tunnel Passing through
Wang Liping
地下空间与工程学报 . 2012, (5): 1070 -1074 .