盾构隧道施工期管片环缝错台全过程特征分析
武文清, 秦楠, 单晓波, 王军可, 柳献
Characteristics Analysis of the Whole Process of Segment Circumferential Joint Dislocation during the Construction Period of Shield Tunnel
Wu Wenqing, Qin Nan, Shan Xiaobo, Wang Junke, Liu Xian
地下空间与工程学报
.
2025, (S1): 436
-441
.
DOI: 10.20174/j.JUSE.2025.S1.52