初支拱盖法在上软下硬地层地铁车站的适用性研究
马天坤, 苏秀婷, 程倩倩, 杜晓涛, 刘丽
Applicability of the Initial Support Arch Cover Method in Subway Stations in Upper Soft and Lower Hard Strata
Ma Tiankun, Su Xiuting, Cheng Qianqian, Du Xiaotao, Liu Li
地下空间与工程学报 . 2025, (S1): 306 -313 .  DOI: 10.20174/j.JUSE.2025.S1.36