大红山铜矿二期采矿工艺及点柱的应用
孙宏生
Sub-level Stoping of Dahongshan Copper Mine and Maintaining the Stability of Stope Roof with Post Pillar
Sun Hongsheng
地下空间与工程学报 . 2016, (2): 516 -521 .