旋喷法作为一种有效的地基加固方法,被应用到基坑、隧道、路基施工等多种工程领域。旋喷桩施工时,高达数十兆帕的注浆压力以及不断注入的水泥浆会对周围土体产生扰动,引起土体变形,危害周边既有结构物的安全。在宁波软土地基上进行了连续旋喷施工试验,研究了连续旋喷施工引起的周围土体的地表变形。采用了全自动全站仪对施工过程中的周边土体进行实时监测。监测结果表明,地表最大水平位移为180.31 mm,地表隆起为179.54 mm。累计地表最大垂直位移与水平位移均随与相邻旋喷桩的距离的增加而减小。在相同距离下,越靠近施工区域中心线,位移越大。基于监测结果,提出了一些减小旋喷桩施工对周边土体影响的方法。
Abstract
As an effective method of foundation reinforcement, the jet grouting method is applied to various engineering fields such as foundation pit, tunnel, subgrade construction and so on. During the construction of jet grouting piles, the grouting pressure is large and the continuous injection of cement slurry will disturb the surrounding soil, causing soil deformation and endangering the safety of existing structures. Continuous jet grouting construction tests were carried out on soft soil foundation in Ningbo City, China, and the surface deformation of surrounding soil caused by continuous jet grouting construction was studied. An automatic total station is used to monitor the deformation of surrounding soil during the construction. The monitoring results show that the maximum lateral displacement of the ground surface is 180.31 mm, and the surface heave is 179.54 mm. The cumulative maximum vertical displacement and lateral displacement of the ground surface both decrease with the increase of the distance from the adjacent jet grouting pile. Under the same distance, the closer to the center line of the construction area, the greater the displacement. The completed jet-grouting piles can reduce the disturbance caused by subsequent construction of jet-grouting piles. Based on the monitoring results, some methods to reduce the impact of jet grouting construction are proposed.
关键词
旋喷桩 /
自动监测 /
地表变形 /
现场试验
{{custom_keyword}} /
Key words
jet grouting pile /
automatic monitoring /
ground surface deformation /
field test
{{custom_keyword}} /
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
参考文献
[1] 龚晓南. 地基处理新技术[M]. 陕西: 陕西科学技术出版社, 1997. (Gong Xiaonan. New techniques for ground treatment[M]. Shanxi: Shaanxi Science and Technology Press, 1997. (in Chinese))
[2]武孝天, 李洪涛, 徐永福. 双向搅拌桩施工对桩周土体扰动分析[J]. 长江科学院院报, 2020, 37(5): 127-132. (Wu Xiaotian, Li Hongtao, Xu Yongfu. Soil disturbance around piles by bidirectional mixing columns construction[J]. Journal of Yangtze River Scientific Research Institute, 2020, 37(5): 127-132. (in Chinese))
[3]张玉国, 段萌萌, 杨晗玥, 等. 真空-堆载联合预压复合地基径向固结理论研究[J]. 地下空间与工程学报, 2020, 16(6): 1729-1736. (Zhang Yuguo, Duan Mengmeng, Yang Hanyue, et al. Study on radial consolidation theory of vacuum-surcharge combined preloading composite foundation[J]. Chinese Journal of Underground Space and Engineering, 2020, 16(6): 1729-1736. (in Chinese))
[4]Tan Y, Wei B. Observed behaviors of a long and deep excavation constructed by cut-and-cover technique in Shanghai soft clay[J]. 2012, 138(1): 69-88.
[5]Peng F L, Wang H L, Tan Y, et al. Field measurements and finite-element method simulation of a tunnel shaft constructed by pneumatic caisson method in Shanghai soft ground[J]. 2011, 137(5): 516-524.
[6]黄绍铭, 高大钊. 软土地基与地下工程[M]. 北京: 中国建筑工业出版社, 2005. (Huang Shaoming, Gao Dazhao. Soft soil foundation and underground engineering[M]. Beijing: China Architecture & Building Press, 2005. (in Chinese))
[7]Bergado D T, Ruenkrairergsa T, Taesiri Y, et al. Deep soil mixing used to reduce embankment settlement[J]. Ground Improvement, 1999, 3(4): 145-162.
[8]Borges J L,Domingues T S, Cardoso A S. Embankments on soft soil reinforced with stone columns: numerical analysis and proposal of a new design method[J]. Geotechnical and Geological Engineering, 2009, 27(6): 667-679.
[9]韩永强, 马少雄. 高压旋喷桩在托换中的工程实践[J]. 地下空间与工程学报, 2007, 3(增1): 1330-1333. (Han Yongqiang, Ma Shaoxiong. Engineering practice of chemical churing process in ground stabilization[J]. Chinese Journal of Underground Space and Engineering, 2007, 3(Supp.1): 1330-1333. (in Chinese))
[10]梁学元. 某深基坑支护高压旋喷桩的工艺性试桩分析[J]. 广东土木与建筑, 2020, 27(9): 31-33. (Liang Xueyuan. Analysis of technical test piles of high-pressure rotary jetting piles supported in a deep foundation[J]. Guangdong Architecture and Civil Engineering, 2020, 27(9): 31-33. (in Chinese))
[11]蔡桂标. 特殊条件下旋喷桩止水帷幕施工技术及成桩质量分析[J]. 广东土木与建筑, 2018, 25(8): 26-28. (Cai Guibiao. Construction technology of waterproof curtain for jet grouting pile and analysis of pile quality under special conditions[J]. Guangdong Architecture and Civil Engineering, 2018, 25(8): 26-28. (in Chinese))
[12]王庆国, 孙玉永. 旋喷桩加固对控制盾构下穿铁路变形数值分析[J]. 地下空间与工程学报, 2008, 4(5): 860-864. (Wang Qingguo, Sun Yuyong. Numerical analysis of settlement for a shield tunnel under-passing the existing railway with rotary jet pile[J]. Chinese Journal of Underground Space and Engineering, 2008, 4(5): 860-864. (in Chinese))
[13]侯桐, 董珍. 水平旋喷桩在北京地铁工程中的应用[J]. 地下空间与工程学报, 2012, 8(2): 1796-1799. (Hou Tong, Dong Zhen. Horizontal jet grouting pile in the Beijing subway project[J]. Chinese Journal of Underground Space and Engineering, 2012, 8(2): 1796-1799. (in Chinese))
[14]Zhang N, Shen S L, Wu H N, et al. Evaluation of effect of basal geotextile reinforcement under embankment loading on soft marine deposits[J].Geotextiles and Geomembranes, 2015, 43(6): 506-514.
[15]Modoni G, Croce P, Mongiovi L. Theoretical modelling of jet grouting[J]. Géotechnique, 2006, 56(5): 335-347.
[16]韩少强, 马少雄. 高压旋喷桩在托换中的工程实践[J]. 地下空间与工程学报, 2007, 3(7): 1330-1333. (Han Shaoqiang, Ma Shaoxiong. Engineering practice of chemical churing process in ground stabilization[J]. Chinese Journal of Underground Space and Engineering, 2007, 3(7): 1330-1333. (in Chinese))
[17]王志丰, 沈水龙. 单根水平旋喷桩施工引起周围土体变形的实用计算方法研究[J]. 工程力学, 2017, 34(5): 78-83. (Wang Zhifeng, Shen Shuilong. An approach to calculate ground deformation induced by installation of single horizontal jet grout column[J]. Engineering Mechanics, 2017, 34(5): 78-83. (in Chinese))
[18]Flora A, Modoni G, Lirer S, et al. The diameter of single, double and triple fluid jet grouting columns: prediction method and field trial results[J]. Géotechnique, 2013, 63(11): 934-945.
[19]Ochmański M, Modoni G, Bzòwka J. Prediction of the diameter of jet grouting columns with artificial neural networks[J]. Soils and Foundation, 2015, 55(2): 425-436.
[20]韩立志, 王志丰. 二重管旋喷工法成桩直径实用计算方法[J]. 中国公路学报, 2019, 32(3): 128-134. (Han Lizhi, Wang Zhifeng. Practical method to predict diameter of jet grout column by double fluid system[J]. China Journal of Highway and Transport, 2019, 32(3): 128-134. (in Chinese))
[21]黄俊谦, 王旭锋, 薛武强. 高压旋喷桩在软土区地基处理中的应用[J]. 江西建材, 2020(11): 162-166. (Huang Junqian, Wang Xufeng, Xue Wuqiang. Application of high pressure jet grouting pile in foundation treatment in soft soil area[J]. Jiangxi Building Materials, 2020(11): 162-166. (in Chinese))
[22]张帅, 张建经, 刘梦冉. 高压旋喷桩施工引起土体变形数值模拟研究[J]. 山西建筑, 2020, 46(22): 70-72. (Zhang Shuai, Zhang Jianjing, Liu Mengran. Numerical simulation research on soil deformation caused by construction of high pressure jet grouting pile[J]. Shanxi Architecture, 2020, 46(22): 70-12. (in Chinese))
[23]Shen S L, Wang Z F, Cheng W C. Estimation of lateral displacement induced by jet grouting in clayey soils[J].Géotechnique, 2017, 67(7): 621-630.
[24]蔡忠明, 王吉望, 沈水龙, 等. 水平旋喷复合管减压排泥装置[P]. 中国专利: 200610147754.5, 2006. (Cai Zhongming, Wang Jiwang, Shen Shuilong, et al. Horizontal rotary jet injection compound pipe decompression mud discharging device[P]. China Patent: 200610147754.5, 2006. (in Chinese))
{{custom_fnGroup.title_cn}}
脚注
{{custom_fn.content}}