边桩是地铁车站洞桩法施工过程中的一个重要构件,其受力状态较复杂。根据洞桩法施工过程受力分析,中板下部土体的开挖是边桩受力状态发生显著变化的主要阶段,当开挖至轨道层底部而未浇筑二衬时,边桩处于受力最不利的状态。基于此,探讨了边桩的内力计算问题,得到了中板下部土体开挖过程中考虑临时横撑作用时桩身内力计算公式,最不利的状态下边桩的内力计算公式,以及考虑桩顶的竖向分力对桩身产生附加弯矩的内力计算公式,并与模型试验结果进行了对比,表明了计算公式的合理性,可供工程设计参考。
Abstract
Piles were important components in construction of metro station using PBA(Pile-Beam-Arch) method, so the influence of tunnel face space on ground deformation could be complicated. According to construction process analysis, loading conditions of piles could be dramatically changed when excavation of the lower bench under the platform slab started and the most dangerous conditions would occur when soil mass excavation of the lower bench were accomplished. The internal force calculation methods were deduced considering the supporting of temporary cross-braces and the most dangerous conditions and additional bending moment caused by vertical loading. Comparisons between model test and calculation results presented its rationality.
关键词
洞桩法 /
边桩 /
内力计算
{{custom_keyword}} /
中图分类号:
O 242.21
{{custom_clc.code}}
({{custom_clc.text}})
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
参考文献
[1] 朱泽民. 地铁暗挖车站洞桩法(PBA)施工技术[J]. 隧道建设,2006, 26(5): 63-65, 100. (Zhu Zemin. Pile-Beam-Arch (PBA) construction technology for mined metro station[J]. Tunnel Construction, 2006, 26(5): 63-65, 100. (in Chinese))
[2] 黄瑞金. 地铁浅埋暗挖洞桩法车站扣拱施工技术[J]. 地下空间与工程学报, 2007,3(2): 268-271, 276. (Huang Ruijin. PBA method applied in the construction of arch in subway station[J]. Chinese Journal of Underground Space and Engineering,2007,3(2): 268-271, 276. (in Chinese))[3] 徐治中, 王恒, 殷文华,等. 邻近建筑物暗挖地铁车站采用洞桩法的技术探讨[J].铁道标准设计, 2004,(4):82-84. (Xu Zhizhong, Wang Heng, Yin Wenhua, et al. An exploration of using PBA method for sub-surface excavation of metro station adjacent to existing buildings[J]. Railway Standard Design, 2004,(4): 82-84. (in Chinese))
[4] 易国华. 分离式车站洞桩法施工地层变形规律分析[J] .隧道建设,2008,28(5): 548-552. (Yi Guohua. Analysis of stratum deformation rules in separate metro stations constructed by Pile-Beam-Arch method[J]. Tunnel Construction, 2008, 28(5): 548-552. (in Chinese))
[5] 李爱东, 康直. 沈阳地铁二号线沈阳北站“洞桩法”计算与分析[J].铁道标准设计, 2007,(5): 85-87. (Li Aidong, Kang Zhi. Calculation and analysis of Shenyangbei Station using PBA method in Shenyang metro line 2[J]. Railway Standard Design, 2007,(5): 85-87. (In Chinese))
[6] 宋月光, 杨慧林, 李涛. 地铁洞桩法施工阶段地下洞室的受力分析[J]. 铁道标准设计, 2005,(7): 97-99. (Song Yueguang, Yang Huilin, Li Tao. Mechanical analysis of underground chamber in metro station construction using Pile-Beam-Arch method[J]. Railway Standard Design, 2005,(7): 97-99. (in Chinese))
[7] 张美琴. 分离岛式暗挖车站的洞桩法结构设计[J]. 隧道建设, 2006, 26(4): 32-36. (Zhang Meiqin. Structural design of separated island metro station constructed by means of Pile-Beam-Arch mining method[J]. Tunnel Construction, 2006, 26(4): 32-36. (in Chinese))
[8] 肖宏彬, 钟辉虹, 王永和. 多层地基中桩的荷载传递分析[J]. 中南工业大学学报(自然科学版), 2005, 34(6): 687-690. (Xiao Hongbin, Zhong Huihong, Wang Yonghe. Analysis of pile′s load transfer in layered soils[J]. Journal of Central South University (Science and Technology), 2003, 34(6): 687-690. (in Chinese))
[9] 朱彦鹏, 王秀丽, 于劲,等. 悬臂式支护桩内力的试验研究[J]. 岩土工程学报, 1999, 21(2): 236-239. (Zhu Yanpeng, Wang Xiuli, Yu Jin, et al. Experimental investigation for the internal force of cantilever supporting piles in excavation[J]. Chinese Journal of Geotechnical Engineering, 1999, 21(2): 236-239. (in Chinese))
[10]杨涛, 周德培, 冯君. 抗滑桩计算的确定性计算模型[J]. 工业建筑, 2007, 37(9): 84-88. (Yang Tao, Zhou Depei, Feng Jun. A deterministic computational model of the anti-slide piles[J]. Industrial Construction, 2007, 37(9): 84-88. (in Chinese))
{{custom_fnGroup.title_cn}}
脚注
{{custom_fn.content}}