Response Surface-Based Analysis of Coupled Structural Behavior and Reinforcement Measures in Shield Tunnels

  • Man Benxuan ,
  • Xia Qiong ,
  • Liu Deren
Expand
  • 1. School of Civil Engineering, Lanzhou Jiaotong University, Lanzhou 730070, P. R. China;
    2. National Experimental Teaching Demonstration Center for Civil Engineering, Lanzhou Jiaotong University, Lanzhou 730070, P. R. China

Received date: 2025-11-02

  Online published: 2026-09-29

Abstract

Foundation pit excavation-induced deformation of underlying shield tunnels exhibits pronounced multi-factor coupling, while the associated structural response mechanisms and graded control schemes have not been systematically clarified. In this study, taking a high-speed railway overcrossing a metro tunnel as the engineering background, a three-dimensional finite element model considering staged excavation and contact nonlinearity is established and validated against field monitoring data and published case studies. On this basis, seven factors are selected as design variables, and the segment crown uplift δs, inter-segment opening angle θ, and bolt stress σb are taken as response variables. By combining the Box-Behnken design with a D-optimal sequential augmentation strategy, a seven-factor quadratic response surface model is constructed. The results indicate that:The pit-tunnel distance and tunnel depth are the primary disturbance factors that amplify or attenuate the structural response, while grouting, bench piles, and ground stiffness significantly suppress deformation; the thickness of the steel strengthening plate and the number of excavation partitions mainly serve for local fine-tuning. Based on the main and interaction effects of the quadratic model, a three-stage deformation evolution mechanism of “Disturbance shielding-Stress diffusion-Stiffness coordination” is summarized. Furthermore, by synthesizing domestic and international deformation control criteria with the numerical results, an I-III structural response risk classification system is established, and the corresponding graded reinforcement schemes are proposed. The study provides a practical basis and theoretical reference for the safety assessment and optimization design of shield tunnels underlying foundation pit excavations under complex overlapping conditions.

Cite this article

Man Benxuan , Xia Qiong , Liu Deren . Response Surface-Based Analysis of Coupled Structural Behavior and Reinforcement Measures in Shield Tunnels[J]. Chinese Journal of Underground Space and Engineering, 2026 , 22(S1) : 465 -478 . DOI: 10.20174/j.JUSE.2026.S1.51

References

[1] 李宇升,喻卫华.深基坑施工对紧邻地铁区间隧道结构影响分析[J].地下空间与工程学报,2013,9(2):352-358.
[2] 高广运,高盟,杨成斌,等.基坑施工对运营地铁隧道的变形影响及控制研究[J].岩土工程学报,2010,32(3):453-459.
[3] 谢强,马瑗婕,吴俊,等.基坑开挖引起下穿交叉隧道变形效应分析[J].地下空间与工程学报,2024,20(5):1695-1705.
[4] 胡海英,张玉成,杨光华,等.基坑开挖对既有地铁隧道影响的实测及数值分析[J].岩土工程学报,2014,36(增2):431-439.
[5] 张金红,刘兴旺,孙政波,等.不同地层下盾构隧道变形与病害统计分析[J].地下空间与工程学报,2025,21(1):320-328, 338.
[6] 郦亮,刘干斌,陆幸,等.邻近基坑开挖地铁隧道的注浆保护试验与数值模拟[J].地下空间与工程学报,2021,17(增1):387-396.
[7] 朱正锋,陶学梅,谢弘帅.基坑施工对运营地铁隧道变形影响及控制研究[J].地下空间与工程学报,2006(1):128-131.
[8] 柳献,唐敏,鲁亮,等.内张钢圈加固盾构隧道结构承载能力的试验研究——整环加固法[J].岩石力学与工程学报,2013,32(11):2300-2306.
[9] 李家平.基坑开挖卸载对下卧地铁隧道影响的数值分析[J].地下空间与工程学报,2009,5(增1):1345-1348, 1360.
[10] 濮居一,刘波.软弱地层中基坑土体加固对下卧地铁隧道变形及开挖影响区的控制效果[J].岩土工程学报, 2021(增2):146-149.
[11] 张艺帆,唐亮,孔祥勋,等.基坑开挖引起下方地铁隧道上浮控制方法研究[J].地下空间与工程学报,2024,20(增1):290-297, 315.
[12] 郑刚,杜一鸣,刁钰.隔离桩对基坑外既有隧道变形控制的优化分析[J].岩石力学与工程学报, 2015(增1):3499-3509.
[13] Montgomery D C. Design and Analysis of Experiments[M]. Hoboken:John Wiley & Sons, 2017.
[14] 宋玉香,刘勇,朱永全.响应面方法在整体式隧道衬砌可靠性分析中的应用[J].岩石力学与工程学报,2004(11):1847-1851.
[15] 丁云.考虑耦合效应的地下结构可靠度响应面分析[D].长沙:湖南大学,2011.
[16] 仉文岗,王焱,宗梓煦,等.隧道施工与运营过程中的可靠度分析方法研究[J].重庆交通大学学报(自然科学版),2020,39(3):1-13.
[17] 张连震.地铁穿越砂层注浆扩散与加固机理及工程应用[D].济南:山东大学,2017.
[18] 岳云鹏,刘晓玉,张龙云,等.基坑分块开挖对下卧盾构隧道的变形影响分析[J].铁道标准设计,2020,64(9):113-119.
[19] 朱春柏,钱栋栋,余忠祥,等.考虑空间效应的基坑开挖对邻近隧道影响分析[J].地下空间与工程学报,2023,19(5):1471-1477.
[20] 魏纲,张鑫海.基坑开挖引起下卧盾构隧道转动与错台变形计算[J].中南大学学报(自然科学版),2019,50(9):2273-2284.
[21] 郑刚,王琦,邓旭,等.不同围护结构变形模式对坑外既有隧道变形影响的对比分析[J].岩土工程学报,2015,37(7):1181-1194.
[22] 杨广武.地下工程穿越既有地铁线路变形控制标准和技术研究[D].北京:北京交通大学,2010.
[23] Lo K Y, Ramsay J A. The effect of construction on existing subway tunnels—a case study from Toronto[J].Tunnelling and Underground Space Technology, 1991,6(3):287-297.
[24] Brenner B, Neff T. Design and management for underground uncertainty on the Central Artery/Tunnel Project[A]//North American Tunneling[C]. Boston, Massachusetts, 2000:13-21.