Excavation of large-diameter shield tunnels may induce significant deformation of segment during the construction period. Meanwhile, the influence on segment deformation varies with different geological conditions and construction stages. The variation law of segment deformation during construction under diverse geological environments remains unclear, posing numerous challenges to construction control. To address this issue, this study is based on the Chongqing Yangtze River Tunnel project. A wireless real-time monitoring system for the three-dimensional deformation of tunnel segments was utilized to conduct extensive and in-depth monitoring of segment deformation during the construction of the large-diameter shield tunnel. Furthermore, a comparative analysis of the segment deformation characteristics under different geological conditions and construction stages was performed. The research results indicate that:The proposed monitoring scheme can effectively solve the problem of difficult segment monitoring in the narrow space after shield segment assembly, while realizing remote wireless transmission of monitoring data. From the time segments exit the shield tail to stabilization, segment deformation continues to increase and stabilizes after 18~20 rings (corresponding to 150~180 hours). The lining deformation is mainly elliptical, with the major axis direction changing during the construction process. For segments located in the high-water-pressure fractured zone, significant vertical displacement occurs after they completely exit the shield tail, accompanied by obvious upward floating of the segments. After the segment rotation stabilizes, the vertical displacement of segments in the high-water-pressure fractured zone is significantly larger than that of segments in the intact rock stratum. The research results provide important reference value for segment deformation during shield tunnel construction in rock strata.
Wu Juncai
,
Chen Yang
,
Jin Junwei
,
Chen Jian
,
Zhang Qinglong
. Deformation Monitoring and Analysis of Large-Diameter Tunnel Segments in Fractured Rock Formations during Construction Period[J]. Chinese Journal of Underground Space and Engineering, 2026
, 22(S1)
: 391
-400
.
DOI: 10.20174/j.JUSE.2026.S1.43
[1] 秦楠,单晓波,武文清,等.盾构隧道施工期管片衬砌外荷载特征分析[J].铁道科学与工程学报,2025,22(5):2229-2241.
[2] 马晓波.施工荷载耦合作用下超大直径盾构隧道结构力学响应[J].城市轨道交通研究,2025,28(9):63-71.
[3] Zhu M, Chen X S, Wang X T. Analysis and thinking on structural performance evolution of shield tunnel lining[J]. Engineering Mechanics, 2022, 39(3):33-50.
[4] 黎程, 马林东, 李国栋, 等. 穿江盾构隧道管片变形特性分析[J]. 上海公路, 2024(3):58-62, 67, 205.
[5] 袁大军,吴俊,沈翔,等.超高水压越江海长大盾构隧道工程安全[J].中国公路学报, 2020,33(12):26-45.
[6] 林伟波, 杨小平, 严振瑞,等. 湛江湾跨海盾构隧道管片变形与受力分析[J]. 隧道建设, 2016, 36(3):288-294.
[7] 崔庆龙, 张晟斌, 许啸鹏, 等. 超大盾构隧道施工期管片受力特征分析[J]. 施工技术(中英文), 2024, 53(3):21-27, 53.
[8] 刘印, 江明明. 盾构隧道接头渗水对其变形及内力的长期影响[J]. 人民长江, 2017, 48(21):96-102.
[9] 鞠杨, 徐广泉, 毛灵涛, 等. 盾构隧道衬砌结构应力与变形的三维数值模拟与模型试验研究[J]. 工程力学, 2005(3):157-165.
[10] 魏龙海, 郑少华, 张亚果, 等. 高水压复杂地质条件下大直径盾构隧道横向受力及变形研究[J]. 现代隧道技术, 2015, 52(4):143-150.
[11] 陈俊生, 莫海鸿. 盾构隧道管片施工阶段力学行为的三维有限元分析[J]. 岩石力学与工程学报, 2006(增2):3482-3489.
[12] 张鹏. 盾构隧道管片施工力学性能三维数值模拟研究[J]. 铁道工程学报, 2012, 29(10):63-69.
[13] 刘伟浩, 周长进, 李秀东, 等. 大直径水下盾构隧道综合监测系统研究[J]. 地下空间与工程学报, 2022, 18(增2):857-864, 873.
[14] 施静康, 黄宏伟, 沈俊, 等. 盾构隧道变形监测传感器的鲁棒性布设方法[J]. 华中科技大学学报(自然科学版), 2025,53 (8):45-50.
[15] 陈晓斌, 王风栋, 吴梦黎, 等. 基于倾角反演的隧道断面变形全方位监测方法[J]. 中南大学学报(自然科学版), 2024, 55(1):151-161.
[16] 樊依林. 基于MEMS加速度传感器的倾角测量仪设计[J]. 工业仪表与自动化装置, 2019(2):106-108, 113.
[17] Chang J, Huang H, Zhang D, et al. Transverse deformational behaviors of segmental lining during shield tunneling:A case study[J]. Structural Control and Health Monitoring, 2022, 29(11):e3097.
[18] Wang F, Shi J, Huang H, et al. A horizontal convergence monitoring method based on wireless tilt sensors for shield tunnels with straight joints[J]. Structure and Infrastructure Engineering, 2021, 17(9):1194-1209.
[19] 邹晋华. 基于有限元分析的TBM隧道管片计算模型[J]. 江西理工大学学报, 2021, 42(4):29-34.
[20] Lee K M,Hou X Y, Ge X W, et al. An analytical solution for a jointed shield-driven tunnel lining[J]. International journal for numerical and analytical methods in Geomechanics, 2001, 25(4):365-390.
[21] Do N A, Dias D,Oreste P, et al. 2D numerical investigation of segmental tunnel lining behavior[J]. Tunnelling and Underground Space Technology, 2013, 37:115-127.
[22] 黄伟明, 王金昌, 徐日庆, 等. 基于弹性地基曲梁理论的盾构隧道管片分析方法[J]. 浙江大学学报(工学版), 2020, 54(4):787-795.
[23] 柳献, 李海涛, 曹伟飚. 盾构隧道新型纵缝接头抗弯性能试验对比研究[J]. 现代隧道技术, 2018, 55(增2):1058-1068.