Research on Performance Enhancement and Adaptability Evaluation of TBM in Xitianshan Super-Long Tunnel

  • Cui Ming ,
  • Di Xuejun ,
  • Huang Shuai
Expand
  • 1. CCCC First Highway Engineering Group Co., Ltd., Beijing 100024, P. R. China;
    2. State Key Laboratory for Tunnel Engineering, China University of Mining and Technology (Beijing), Beijing 100083, P. R. China

Received date: 2026-01-12

  Online published: 2026-09-29

Abstract

To address the lack of quantitative criteria for evaluating TBM adaptability under the complex geological conditions of the Xitianshan super-long tunnel,based on on-site measured data, combined with the rock mass grade and the distribution characteristics of unfavorable geology, a WGM-TOPSIS comprehensive evaluation system was constructed that balances excavation efficiency and excavation economy.The results show that:The TBM in Xitianshan has achieved targeted improvements in thrust, rated torque, cutterhead configuration, and advanced detection system compared to similar equipment in the Tianshan Shengli Tunnel. The thrust has increased by 25.44%, and the rated torque has increased by 37.78%.The evaluation results show that the TBM excavation efficiency is close to 0.795 4, achieving complete adaptation; The economic closeness of excavation is 0.798 0, which is at a relatively high adaptability level; When considering the rapid construction needs of flat guidance, taking an efficiency weight of 0.8 and an economic weight of 0.2, the comprehensive closeness is 0.795 9, and the adaptability level is fully adapted; The project completed 8 878 m horizontal excavation within 506 days, verifying the rationality of equipment selection and parameter configuration. The research results can provide reference for TBM selection, parameter optimization, and construction control of similar ultra long hard rock tunnels.

Cite this article

Cui Ming , Di Xuejun , Huang Shuai . Research on Performance Enhancement and Adaptability Evaluation of TBM in Xitianshan Super-Long Tunnel[J]. Chinese Journal of Underground Space and Engineering, 2026 , 22(S1) : 375 -381 . DOI: 10.20174/j.JUSE.2026.S1.41

References

[1] 邓铭江,谭忠盛.超特长隧洞TBM集群试掘进阶段适应性分析[J].隧道建设(中英文),2019,39(1):1-22.
[2] 李亚隆.天山胜利隧道TBM选型及不良地质预防研究[J].智能城市,2019,5(12):58-59.
[3] 余洁.中天山隧道TBM掘进施工适应性研究[J].现代隧道技术,2014,51(3):57-60,66.
[4] 王挺.西天山特长隧道TBM针对性设计[J].工程机械,2025,56(4):181-183, 15.
[5] 詹金武,黄明,孙春明,等.基于模糊数学和改进遗传算法的滨海地层盾构选型研究[J].铁道科学与工程学报, 2022, 19(2):480-490.
[6] 程立铭,谢柯,燕新.新疆某特长隧道TBM设备选型与适应性评估研究[J].建筑机械, 2025 (11):141-144.
[7] 邓铭江,谭忠盛.敞开式TBM地质适应性评价方法研究[J].隧道建设(中英文),2025,45(6):1043-1060.
[8] 来海祥.基于多目标决策理论的敞开式TBM掘进适应性评价方法研究[D].北京:北京交通大学,2023.
[9] 沈远伟,朱昊,曹梦炫,等.基于智能集成算法的煤矿TBM掘进参数多目标优化方法研究[J].煤炭工程, 2025, 57(9):129-137.
[10] 陈思溢,胡双麟,袁博.基于EWT-TOPSIS融合和波动性感知注意力的短期电力负荷预测[J].计算机应用研究,2026,43(4):1046-1053.
[11] 张倩,陈亮,李蕊,等.基于AHP-TOPSIS法的分布式光伏并网安全性评估[J].浙江工业大学学报,2025,53(6):617-622.