Study on Three-dimensional Drainage and Construction Technology of Deep-Buried Extra-High Pressure Slurry Balance Pipe Jacking

  • Tuo Mingxing ,
  • Feng Saiao ,
  • Chen Junwu ,
  • Feng Chaiwei ,
  • Deng Zhiyun
Expand
  • 1. Yunnan Communications Investment & Construction Group Co., Ltd., Kunming 650032, P. R. China;
    2. School of Civil Engineering, Beijing Jiaotong University, Beijing 100044, P. R. China;
    3. Yunnan Institute of Transportation Planning and Design, Kunming 650011, P. R. China;
    4. China Railway Tunnel Group Construction Co., Ltd., Foshan, Foshan, Guangdong 528000, P. R. China

Received date: 2025-12-05

  Online published: 2026-09-29

Abstract

Conventional drainage methods show insufficient adaptability in the construction of deep-buried, water-rich tunnels under high water pressure and severe water-inrush risks. To address this issue, a three-dimensional drainage technique based on slurry-balance pipe jacking was proposed, and its performance and key technical issues were systematically investigated through the Wangjiazhai Tunnel project.By installing large-diameter slurry balance pipes ahead of the tunnel face and integrating radial drainage holes within the pipes to form a three-dimensional drainage network, centralized discharge of confined groundwater and reconstruction of the hydraulic environment were achieved.Engineering practice demonstrated that after the operation of the pipe jacking drainage system, the water pressure at the tunnel face was stably reduced from approximately 0.35 MPa to 0.15~0.20 MPa, significantly mitigating the hazard potential associated with high-pressure groundwater.To overcome the high jacking resistance encountered in strongly water-rich fine sandy strata, a combined approach involving thixotropic slurry lubrication and vibration-assisted friction reduction was adopted. Statistical results from construction indicated that the dynamic pipe-soil friction resistance was reduced by approximately 26.5% compared with the static friction resistance, effectively improving jacking stability during stop-restart conditions.On this basis, the applicability of different jacking force calculation methods in ultra-high-pressure water-rich strata was comparatively analyzed. It was pointed out that jacking force values determined solely by structural control are insufficient to represent the resistance upper bound under extreme conditions, and that the effects of confined water pressure and cumulative friction should be incorporated, together with a system-level segmented jacking strategy.The findings of this study can provide a reference for drainage design and construction risk control in similar deep-buried, strongly water-rich underground space engineering projects.

Cite this article

Tuo Mingxing , Feng Saiao , Chen Junwu , Feng Chaiwei , Deng Zhiyun . Study on Three-dimensional Drainage and Construction Technology of Deep-Buried Extra-High Pressure Slurry Balance Pipe Jacking[J]. Chinese Journal of Underground Space and Engineering, 2026 , 22(S1) : 337 -346 . DOI: 10.20174/j.JUSE.2026.S1.37

References

[1] Chen P, Liu X, Deng Z, et al. Study on the pipe friction resistance in long-distance rock pipe jacking engineering[J]. Underground Space, 2023,9(2):173-185.
[2] Zhong Z, Zhu K, Tang J, et al. Intelligent Prediction of Cutting Depth and Parameter Optimization in Abrasive Waterjet Cutting[J]. Rock Mechanics and Rock Engineering, 2026,59(3):3793-3820.
[3] Zhu K, Zhong Z, Wang N, et al. Mechanical Properties and Nonlinear Energy Evolution of Holed Limestone Under Hydro-Mechanical Coupling[J]. Rock Mechanics and Rock Engineering, 2025, 58(1):807-826.
[4] Deng Z, Liang N, Liu X, et al. Analysis and application of friction calculation model for long-distance rock pipe jacking engineering[J]. Tunnelling and Underground Space Technology, 2021, 115:104063.
[5] 谢森林, 胡安峰, 肖志荣, 等. 渗漏病害加剧影响下隧道周围土体流变固结分析[J]. 岩石力学与工程学报, 2024, 43(10):2570-2580.
[6] 孙阳, 宋德威, 李耀东, 等. 矩形顶管考虑泥浆触变特性的顶推力计算[J]. 地下空间与工程学报, 2022, 18(4):1097-1103.
[7] 刘嘉淳, 李志华, 谈力昕, 等. 泥水平衡顶管技术在商周高速穿越工程中的应用[J]. 地质科技情报, 2016, 35(2):28-32.
[8] 张志伟, 李忠超, 梁荣柱, 等. 软土地层矩形顶管掘进引起地表隆沉变形分析[J]. 岩土力学, 2022, 43(增1):419-430.
[9] 夏洋洋, 方宏远, 张超, 等. 顶管施工对新型复合装配式支护工作井的力学响应分析[J]. 岩土力学, 2022, 43(10):2799-2808.
[10] 傅德明, 楼如岳. 泥水平衡顶管施工及参数研究[J]. 岩石力学与工程学报, 2003(增1):2493-2501.
[11] 张鹏, 谈力昕, 马保松. 考虑泥浆触变性和管土接触特性的顶管摩阻力公式[J]. 岩土工程学报, 2017, 39(11):2043-2049.
[12] 谢一鸣, 谢孔金, 王海洋, 等. 市政污水管道泥水平衡顶管施工技术[J]. 施工技术(中英文), 2023, 52(24):89-92.
[13] 杨恺. 复杂地质条件下顶管施工效率及影响因素研究[J]. 人民长江, 2019, 50(10):171-174.
[14] Ye Y, Peng L, Zhou Y, et al. Prediction of Friction Resistance for Slurry Pipe Jacking[J]. Applied Sciences, 2019, 10(1):10010207.
[15] Deng Z, Liu X, Zhou X, et al. Main engineering problems and countermeasures in ultra-long-distance rock pipe jacking project:Water pipeline case study in Chongqing[J]. Tunnelling and Underground Space Technology, 2022, 123:104420.
[16] Deng Z, Liu X, Zhou X, et al. Field monitoring of mechanical parameters of deep-buried jacketed-pipes in rock:Guanjingkou water control project[J]. Tunnelling and Underground Space Technology, 2022, 125:104531.
[17] 秦林, 郝欣, 汪林. 顶管技术在地下空间中小型管道施工中的应用[J]. 现代隧道技术, 2022, 59(增2):228-33.
[18] Ma X, Tang G, Cao M, et al. Slurry rheological effect on grouting in pipe jacking based on centrifuge model tests[J]. International Journal of Physical Modelling in Geotechnics, 2025, 25(4):209-218.
[19] Wen K, Zeng W, Shimada H, et al. Numerical and theoretical study on the jacking force prediction of slurry pipe jacking traversing frozen ground[J]. Tunnelling and Underground Space Technology, 2021, 115:104076.
[20] 王盟盟, 范磊, 孙英杰, 等. 适用于超长距离的硬岩顶管机关键技术研究及应用[J]. 隧道建设(中英文), 2025, 45(增1):351-360.
[21] Xu Y, Zhang Z, Zhang C, et al. Analysis of longitudinal deformation of existing rectangular pipe jacking tunnel caused by shield tunnel undercrossing[J]. Tunnelling and Underground Space Technology, 2025, 161:106532.
[22] Liu W, Zhang S, Chen W, et al. Analytical method for the vertical response of existing shield tunnel induced by above-crossing multiple parallel pipe jacking[J]. Tunnelling and Underground Space Technology, 2025, 165:106873.
[23] 龚廷民, 贾连辉, 谌文涛, 等. 适用于复合地层的硬岩泥水平衡顶管关键技术[J]. 隧道建设(中英文), 2020, 40(6):880-889.
[24] 孙庆, 冯文强, 王志云, 等. 大东湖核心区污水传输支隧工程顶管施工关键技术研究与应用[J]. 隧道建设(中英文), 2021, 41(7):1218-1224.
[25] 中国工程建设标准化协会. 给水排水工程顶管技术规程(CECS 246-2008)[S]. 北京:中国计划出版社, 2008.
[26] 中华人民共和国交通运输部. 公路隧道设计规范(JTG 3370.1-2018)[S]. 北京:人民交通出版社, 2018.
[27] 中华人民共和国住房和城乡建设部. 钢结构设计标准(GB 50017-2017)[S]. 北京:中国建筑工业出版社,2017.
[28] 曾建军, 赵东平, 王风, 等. 顶管隧道研究现状与发展趋势[J]. 现代隧道技术, 2024, 61(增1):1-16.
[29] 王乐, 贺建群, 范昌彬. 复杂条件下顶管注浆减阻技术研究与应用[J]. 现代隧道技术, 2018, 55(3):200-4.
[30] Ye Y, Peng L, Yang W, et al. Calculation of Friction Force for Slurry Pipe Jacking considering Soil-Slurry-Pipe Interaction[J]. Advances in Civil Engineering, 2020, 2020(1):6594306.
[31] 叶艺超, 彭立敏, 杨伟超, 等. 考虑泥浆触变性的顶管顶力计算方法[J]. 岩土工程学报, 2015, 37(9):1653-1659.
[32] Liu J, Cheng H, Cai H, et al. Design and Analysis of Grouting Pressure in Slurry Pipe Jacking Based on the Surrounding Soil Stability Mechanical Characteristics[J]. Geofluids, 2022, 2022:1-17.
[33] Wadood A, Mccabe B A, Sheil B B. Field monitoring and instrumentation in microtunnelling/pipe jacking:A review and future directions[J]. Underground Space, 2025, 22:225-240.
[34] Sterling R L. Developments and research directions in pipe jacking and microtunneling[J]. Underground Space, 2020, 5(1):1-19.
[35] 中华人民共和国交通运输部. 公路隧道设计细则(JTG/T D70-2010)[S]. 北京:人民交通出版社, 2010.
[36] 钟祖良, 杜传烨, 刘新荣, 等. 岩石顶管穿越深大断层破碎带摩阻力计算方法研究[J]. 岩土力学, 2025, 46(3):943-954.
Outlines

/

〈 〉