Research on Anti-Floating Control Measures for Large-Diameter Shield Tunnel under Ultra-Shallow Overburden

  • He Jianlin ,
  • Ni Bibo ,
  • Jiang Ya ,
  • Wu Kui ,
  • Sun Fengbiao
Expand
  • 1. Shanghai-Hangzhou Railway Passenger Dedicated Line Co., Ltd., Shanghai 200040, P. R. China;
    2. Engineering Quality Supervision Station, China Railway Shanghai Group Co., Ltd., Shanghai 200040, P. R. China;
    3. China Railway 14th Bureau Group Shield Engineering Co., Ltd., Nanjing 211800, P. R. China

Received date: 2025-09-21

  Online published: 2026-09-29

Abstract

Based on the Tongyong High-speed Railway Suzhou East Tunnel project, this study addresses the anti-floating stability control of large-diameter shield tunnels under ultra-shallow overburden conditions, where the overlying stratum thickness is less than 0.1 times the tunnel diameter. By integrating theoretical calculations, numerical simulations, and field monitoring, the effectiveness of combined anti-floating control measures—comprising ground reinforcement and portal frame structures, is verified. Theoretical analysis identifies the primary force mechanisms influencing tunnel uplift. Conventional ground reinforcement alone fails to meet anti-floating stability requirements; however, implementing portal frame structures effectively achieves tunnel anti-floating stability. Finite element simulations confirm the effectiveness of portal frame structures in resisting uplift, with the anti-floating performance primarily depending on the interaction forces between the anti-floating slab and surrounding soil. Surface monitoring was conducted on the shallow soil cover section. The cross-sectional deformation presented a convex shape, with a maximum uplift displacement of 9.7 mm, mainly affecting the range of 1.5 times the tunnel diameter. The longitudinal section deformation showed a three-segment distribution feature, mainly affected by the depth of soil cover and anti-floating measures. The vertical surface uplift did not exceed the specified warning values,verifying the effectiveness of the combined anti-floating control measures of stratum reinforcement and portal frame structure.

Cite this article

He Jianlin , Ni Bibo , Jiang Ya , Wu Kui , Sun Fengbiao . Research on Anti-Floating Control Measures for Large-Diameter Shield Tunnel under Ultra-Shallow Overburden[J]. Chinese Journal of Underground Space and Engineering, 2026 , 22(S1) : 329 -336 . DOI: 10.20174/j.JUSE.2026.S1.36

References

[1] 柳献, 纪汉卿, 甘海杰, 等. 超高性能混凝土加固盾构隧道结构试验与数值研究[J]. 同济大学学报(自然科学版), 2024, 52(11):1720-1730.
[2] 韩圣章, 冀叶涛, 赵林嵩, 等. 盾构隧道下穿高铁站影响规律与控制措施:以天津地铁四号线下穿天津西站为例[J]. 科学技术与工程, 2024, 24(31):13601-13611.
[3] 舒瑶, 季昌, 周顺华, 等. 考虑地层渗透性的盾构隧道施工期管片上浮预测[J]. 岩石力学与工程学报, 2017, 36(增1):3516-3524.
[4] 叶飞, 朱合华, 丁文其, 等. 施工期盾构隧道上浮机理与控制对策分析[J]. 同济大学学报(自然科学版), 2008(6):738-743.
[5] 李明宇, 余刘成, 陈健, 等. 粉质黏土中大直径泥水盾构隧道管片上浮及错台现场测试分析[J]. 铁道科学与工程学报, 2022, 19(6):1705-1715.
[6] 李海滨, 余刘成, 李明宇, 等. 浅覆土大直径盾构管片上浮规律及控制分析[J]. 地下空间与工程学报, 2024, 20(6):2000-2009.
[7] 曾红波, 石州, 涂金光, 等. 临海富水地层大直径盾构隧道管片上浮机制及控制措施[J]. 公路交通科技, 2024, 41(1):138-151.
[8] 李明宇, 王越, 陈健, 等. 同步注浆上浮力作用下大盾构管片瞬时变形特征模型试验研究[J]. 铁道学报, 2025, 47(1):171-182.
[9] 刘汉龙, 姜佳奇, 刘智成, 等. 富水环境下盾构隧道最小覆盖层厚度设计与计算方法综述[J]. 隧道建设(中英文), 2024, 44(6):1127-1144.
[10] 宋元平, 骆俊晖, 黄华康. 大直径水下盾构隧道合理埋置深度分析[J]. 西部交通科技, 2019(5):113-117.
[11] 王大海, 钱伟丰, 王炳楠. 盾构穿越海域吹填砂层临界覆土厚度计算方法[J]. 地下空间与工程学报, 2023, 19(增2):583-592,616.
[12] 戴小平, 郭涛, 秦建设. 盾构机穿越江河浅覆土层最小埋深的研究[J]. 岩土力学, 2006 (5):782-786.
[13] 焦建伟, 王空前. 浅覆土盾构最小埋深的正交试验分析[J]. 现代隧道技术, 2014, 51(3):138-143,151.
[14] 苏稚寅, 覃鹏. 浅覆土超大直径盾构上浮与诱发地表隆起机理研究[J]. 地球科学前沿, 2024, 14(4):437-444.
[15] 孙超, 张光伟, 答武强, 等. 临山条件下大直径盾构隧道抗浮控制技术[J]. 隧道与地下工程灾害防治, 2024, 6(4):27-37.
[16] 黄昌富, 龙文, 宋棋龙, 等. 加固范围对软土浅埋超大直径盾构掘进地表沉降的影响[J]. 岩土工程学报, 2021, 43(增2):76-79.
[17] 刘方, 崔建, 徐汪豪, 等. 大直径泥水平衡盾构浅覆土始发地表沉降特性[J]. 铁道工程学报, 2018, 35(12):36-40,69.
[18] 苏稚寅. 大直径泥水平衡盾构机超浅覆土施工控制技术及实践[J]. 科技与创新, 2024(12):109-111.
[19] 阳芳. 狮子洋隧道明挖敞开结构抗浮设计[J]. 铁道工程学报, 2009, 26(10):64-68.
[20] 蓝淦洲. 基于门式抗浮框架的基坑开挖下卧隧道变形控制研究[D]. 长沙:湖南大学, 2021.
[21] 吴怀娜, 冯东林, 刘源, 等. 基于门式抗浮框架的基坑开挖下卧隧道变形控制[J]. 上海交通大学学报, 2022, 56(9):1227-1237.
[22] 陈福斌, 祁恒远, 蓝淦洲, 等. 门式抗浮框架对隧道变形控制效果实测分析[J]. 施工技术(中英文), 2022, 51(13):96-101.
[23] 刘源, 陈仁朋, 程红战, 等. 门式抗浮框架作用下上方开挖既有盾构隧道响应解析解[J]. 岩土工程学报, 2024, 46(8):1675-1684.
[24] 叶飞. 软土盾构隧道施工期上浮机理分析及控制研究[D]. 上海:同济大学, 2007.
[25] 赵瀚. 考虑浆液时效性的盾构隧道施工期上浮机理研究[D]. 西安:西安科技大学, 2019.
[26] 王涵. 大直径盾构隧道管片上浮机理与施工控制研究[D]. 济南:山东大学, 2022.
Outlines

/

〈 〉