Large-diameter shield technology has become the preferred method for construction of urban rail transit. However, large-diameter shield tunnel construction faces severe challenges, including large-section excavation, high construction loads, and significant ground disturbance. Currently, research on the dynamic evolution and mechanism of surrounding rock stress induced by excavation and subsequent grouting in large-diameter shield tunneling remains insufficient. This paper proposes a real-time monitoring method for surrounding rock stress during shield tunneling, enabling the monitoring and analysis of stress variations in large-diameter earth pressure balance (EPB) shield tunnels during construction. Based on monitoring results, the paper analyzes the evolution of additional stress during shield tunneling and discusses calculation methods for additional stress induced by shield excavation. The total stress changes in surrounding rock during shield tunneling occur in two stages. Caused by contact pressure applied by the shield cutterhead to the tunnel face before its arrival at the monitoring location and induced by synchronous grouting pressure after segment installation at the monitoring location following cutterhead passage. A residual additional stress persists even after the shield passes through the monitoring zone. The paper derives calculation methods for additional stress in Stage I based on cutterhead contact pressure and for Stage II based on synchronous grouting pressure. Furthermore, it proposes calculation methods for the maximum total additional stress and residual additional stress in different spacing due to shield tunneling. The above calculation method was verified by shield tunneling in other sections. Results show that the proposed method meets engineering requirements for 9m-class EPB shields in sound hard rock. The stress influence zone is about 0.5 shield diameter. Face contact pressure and synchronous grouting pressure should be strictly controlled to reduce additional stress and residual deformation.
Li Jichao
,
Guo Dong
,
Luan Shuai
,
Qiu Yunjun
,
Li Yongyu
. Analysis and Calculation of the Stress Variation on Surrounding Rock during Large Diameter Shield Construction[J]. Chinese Journal of Underground Space and Engineering, 2026
, 22(S1)
: 222
-229
.
DOI: 10.20174/j.JUSE.2026.S1.25
[1] 加瑞,李青茁,杨岗,等. 盾构隧道渗漏对地表沉降和管片受力影响研究[J].地下空间与工程学报,2023,19(增1):423-435.
[2] 黄辉,潘泓,陈乔松,等. 高富水复合砂层盾构隧道渗透破坏原因分析[J]. 地下空间与工程学报,2024,20(1):302-310.
[3] Han W W, Wang X G, Han L J. Study on the optimum grouting materials and their performance in the TBM tunnel collapse reinforcement project[J]. IOP Conference Series:Earth and Environmental Science, 2020, 570(5):52-65.
[4] Hong K R. Typical underwater tunnels in the mainland of China and related tunneling technologies[J]. Engineering, 2017, 3(6):871-879.
[5] 方焘,梁连,颜建伟. 不同埋深下盾构隧道施工引起的地层变形试验[J].长江科学院院报,2023,40(3):85-92.
[6] Hamderi M. Footing settlement formula based on multi-variable regression analyses[J]. Geomechanics and Engineering, 2019, 17(1):11-18.
[7] Toshi N, Shinichiro I, Toshiyuki H, et al. Shield tunnel construction in centrifuge[J]. Journal of Geotechnical and Geoenvironmental Engineering, 1999, 125(4):132-142.
[8] 赵玉勃,张忠苗. 盾构法隧道推进引起周围土体的附加应力分析[J]. 岩土工程学报,2010,32(9):1386-1390.
[9] 孙统立,张庆贺,韦良文,等. 双圆盾构掘进施工扰动土体附加应力分析[J].岩土力学, 2008, 29(8):2246-2251.
[10] 储昭飞,刘保国. 盾构法施工深埋斜井的围岩应力变形分析[J]. 北京交通大学学报, 2016, 40 (6):1-6.
[11] 陈昂,张雪辉,白云,等. 类矩形土压平衡盾构施工附加应力分析[J]. 岩石力学与工程学报, 2017, 36(7):1813-1819.
[12] 武崇福,魏超,乔菲菲. 既有上部建筑荷载下盾构施工引起土体附加应力分析[J].岩石力学与工程学报, 2018, 37(7):14.
[13] 孙洋,荣耀,习小华,等. 近接施工先行隧道盾构管片三维附加应力监测分析[J]. 公路, 2016, 61(4):239-247.
[14] Liu N, Wen Z Y, You G M, et al. Study on the calculation of the surrounding rock stress on shield tunnels in rock strata[J]. Geotechnical and Geological Engineering, 2023, 41(8):4383-4393.
[15] 黄宏伟,胡昕.顶管施工力学效应的数值模拟分析[J].岩石力学与工程学报, 2003, 22(3):400-406.
[16] 周中,胡江锋,刘撞撞,等. 盾构隧道壁后注浆浆液时变性对围岩应力与变形的影响机理[J].中国铁道科学,2022,43(3):86-93.
[17] Liu N, Wen Z, You S, et al. Study on the calculation of the surrounding rock stress on shield tunnels in rock strata[J]. Geotechnical and geological engineering, 2023, 41(8):4383-4393.
[18] 李志明,廖少明,戴志仁. 盾构同步注浆填充机理及压力分布研究[J]. 岩土工程学报, 2010, 32(11):1752-1757.
[19] 王洪新. 土压平衡盾构刀盘挤土效应及刀盘开口率对盾构正面接触压力影响[J].土木工程学报, 2009, 42(7):113-118.
[20] 叶飞,苟长飞,毛家骅,等. 黏土地层盾构隧道临界注浆压力计算及影响因素分析[J].岩土力学,2015,36(4):937-945.