[1] 钱七虎,胡小强,李树忱,等. 中国盾构隧道工程关键技术的新进展综述[J]. 隧道建设(中英文), 2024, 44 (5): 897-926. (Qian Qihu, Hu Xiaoqiang, Li Shuchen, et al. Recent advances in key technologies of shield tunnel engineering in China[J]. Tunnel Construction, 2024, 44(5): 897-926. (in Chinese))
[2] 《中国公路学报》编辑部. 中国交通隧道工程学术研究综述·2022[J]. 中国公路学报, 2022, 35 (4): 1-40. (Editorial Department of China Journal of Highway and Transport. Review on China's traffic tunnel engineering research: 2022[J]. China Journal of Highway and Transport, 2022, 35(4): 1-40. (in Chinese))
[3] 代洪波,季玉国. 我国大直径盾构隧道数据统计及综合技术现状与展望[J]. 隧道建设(中英文), 2022, 42 (5): 757-783. (Dai Hongbo, Ji Yuguo. Statistical analysis of Chinese large-diameter shield tunnel and state-of-art and prospective of comprehensive technologies[J]. Tunnel Construction, 2022, 42(5): 757-783. (in Chinese))
[4] 郭保和,徐纯杰,赵赢. 珠海隧道超大直径泥水盾构针对性设计研究[J]. 隧道建设(中英文), 2023, 43 (增1): 530-534. (Guo Baohe, Xu Chunjie, Zhao Ying. Targeted design of super-large diameter slurry shield applied in Zhuhai tunnel[J]. Tunnel Construction, 2023, 43(Supp.1): 530-534. (in Chinese))
[5] 朱伟,钱勇进,闵凡路,等. 中国泥水盾构使用现状及若干问题[J]. 隧道建设(中英文), 2019, 39 (5): 724-735. (Zhu Wei, Qian Yongjin, Min Fanlu, et al. The current status and some problems of slurry shield in China[J]. Tunnel Construction, 2019, 39(5): 724-735. (in Chinese))
[6] 梅源,史文艳,周东波,等. 上软下硬地层大直径盾构施工Peck沉降公式修正[J]. 地下空间与工程学报, 2024, 20 (6): 1798-1805. (Mei Yuan, Shi Wenyan, Zhou Dongbo, et al. Correction of Peck settlement formula for large diameter shield construction in upper soft and lower hard strata[J]. Chinese Journal of Underground Space and Engineering, 2024, 20(6): 1798-1805. (in Chinese))
[7] Peck R B. Deep excavations and tunneling in soft ground[A]//Proc. of 7th ICSMFE, Mexico[C]. 1969.
[8] 胡长明,冯超,梅源,等. 西安富水砂层盾构施工Peck沉降预测公式改进[J]. 地下空间与工程学报, 2018, 14 (1): 176-181. (Hu Changming, Feng Chao, Mei Yuan, et al. Modifying of Peck's settlement calculation formula related to metro tunnel construction in Xi'an water-rich sand[J]. Chinese Journal of Underground Space and Engineering, 2018, 14(1): 176-181. (in Chinese))
[9] 田均举,朱坤,蔡松,等. 基于郑州地铁下穿南水北调干渠的Peck公式反演分析[J]. 安全与环境工程, 2021, 28 (2): 109-113, 132. (Tian Junju, Zhu Kun, Cai Song, et al. Inversion analysis of Peck formula based on Zhengzhou subway running down the main channel of south-to-north water transfer[J]. Safety and Environmental Engineering, 2021, 28(2): 109-113, 132. (in Chinese))
[10] 牛永前,杨立林,申鲁. 基于Peck公式的富水砂质地层盾构隧洞施工沉降分析[J]. 人民黄河, 2023, 45 (4): 130-135, 142. (Niu Yongqian, Yang Lilin, Shen Lu. Sedimentation analysis of shield tunnel construction on water-rich sandy stratum based on Peck formula[J]. Yellow River, 2023, 45(4): 130-135, 142. (in Chinese))
[11] 贾宝新,高宗贤,惠鹏飞. 上软下硬地层隧道盾构施工引起的地表沉降研究[J]. 安全与环境学报, 2021, 21 (3): 1083-1088. (Jia Baoxin, Gao Zongxian, Hui Pengfei. A proper approach to the surface settlement induced by the shield tunneling through the upper-soft and lower-hard ground[J]. Journal of Safety and Environment, 2021, 21(3): 1083-1088. (in Chinese))
[12] 刘俊杰,刘俊伟,任晓敏,等. 土岩复合地层隧道盾构开挖地表沉降Peck公式修正[J]. 河南理工大学学报(自然科学版), 2022, 41 (2): 171-177. (Liu Junjie, Liu Junwei, Ren Xiaomin, et al. Modification of Peck formula for ground settlement caused by shield tunneling in soil-rock composite stratum[J]. Journal of Henan Polytechnic University (Natural Science), 2022, 41(2): 171-177. (in Chinese))
[13] 郜新军,魏文宇,李珊珊,等. 洛阳盾构隧道地表沉降Peck公式参数修正[J]. 郑州大学学报(工学版), 2025, 46(1): 75-81. (Gao Xinjun, Wei Wenyu, Li Shanshan, et al. Parameters modification of Peck formula for surface settlement of shield tunnelling in Luoyang[J]. Journal of Zhengzhou University (Engineering Science), 2025, 46(1): 75-81. (in Chinese))
[14] 宫亚峰,王博,魏海斌,等. 基于Peck公式的双线盾构隧道地表沉降规律[J]. 吉林大学学报(工学版), 2018, 48 (5): 1411-1417. (Gong Yafeng, Wang Bo, Wei Haibin, et al. Surface subsidence law of double-line shield tunnel based on Peck formula[J]. Journal of Jilin University (Engineering and Technology Edition), 2018, 48(5): 1411-1417. (in Chinese))
[15] 丁智,王凡勇,魏新江. 软土双线盾构施工地表变形实测分析与预测[J]. 浙江大学学报(工学版), 2019, 53 (1): 61-68. (Ding Zhi, Wang Fanyong, Wei Xinjiang. Prediction and analysis of surface deformation caused by twin shield construction in soft soil[J]. Journal of Zhejiang University (Engineering Science), 2019, 53(1): 61-68. (in Chinese))
[16] 师刚,袁浩旭,张澄玄,等. 基于Peck公式的双线隧道地面沉降模型及参数研究[J]. 城市轨道交通研究, 2022, 25 (1): 161-165. (Shi Gang, Yuan Haoxu, Zhang Chengxuan, et al. Study on ground settlement model and parameters of twin-line tunnel based on Peck formula[J]. Urban Mass Transit, 2022, 25(1): 161-165. (in Chinese))
[17] 王超,单生彪. 双线盾构隧道斜交下穿既有机场高速公路的地表沉降预测模型研究[J]. 中国安全生产科学技术, 2023, 19 (1): 85-94. (Wang Chao, Shan Shengbiao. Study on prediction model for ground settlement of double-track shield tunnel oblique undercrossing existing airport expressway[J]. Journal of Safety Science and Technology, 2023, 19(1): 85-94. (in Chinese))
[18] 乙珂豪,师文豪,吴静红,等. 软土地层双线隧道地表沉降计算公式修正[J]. 科学技术与工程, 2024, 24 (4): 1627-1634. (Yi Kehao, Shi Wenhao, Wu Jinghong, et al. Correction of surface settlement prediction formula for twin tunnel with soft ground[J]. Science Technology and Engineering, 2024, 24(4): 1627-1634. (in Chinese))
[19] 张颖. 盾构隧道近距离穿越施工技术研究[D]. 上海: 同济大学, 2007. (Zhang Ying. Research on the construction technology of subway shield tunneling across the closely tunnels[D]. Shanghai: Tongji University, 2007. (in Chinese))
[20] 赵东平,沈振东,王风,等. 砂卵石泥岩复合地层盾构隧道施工导致的地表沉降槽宽度计算方法研究[J]. 现代隧道技术, 2022, 59 (增1): 32-41. (Zhao Dongping, Shen Zhendong, Wang Feng, et al. Study on calculation method of surface settlement trough width caused by shield tunnelling in sandy pebble mudstone composite stratum[J]. Modern Tunnelling Technology, 2022, 59(Supp.1): 32-41. (in Chinese))
[21] 李娴,王思瑶,张标,等. 双孔隧道的地表沉降预测及其可靠度分析[J]. 地下空间与工程学报, 2019, 15 (增1): 428-435. (Li Xian, Wang Siyao, Zhang Biao, et al. Ground surface settlement prediction and reliability analysis of twin tunnels[J]. Chinese Journal of Underground Space and Engineering, 2019, 15(Supp.1): 428-435. (in Chinese))
[22] 冯亮,巫锡勇,牟迪,等. 成都砂卵石地层双线隧道Peck公式参数取值研究[J]. 铁道科学与工程学报, 2017, 14 (1): 100-109. (Feng Liang, Wu Xiyong, Mou Di, et al. Parameters selection research of Peck formula for twin tunnels in sandy-pebble stratum[J]. Journal of Railway Science and Engineering, 2017, 14(1): 100-109. (in Chinese))
[23] 孟乔,张晓清. 复合地层双线盾构上跨既有地铁隧道施工诱发地表沉降分析[J]. 铁道建筑技术, 2017(11): 96-101. (Meng Qiao, Zhang Xiaoqing. Study on ground surface settlement induced by double track shield tunnelling upper-crossing existing metro tunnel in composite ground[J]. Railway Construction Technology, 2017(11): 96-101. (in Chinese))
[24] 魏纲,周杨侃. 随机介质理论预测近距离平行盾构引起的地表沉降[J]. 岩土力学, 2016(增2): 113-119. (Wei Gang, Zhou Yangkan. A simplified method for predicting ground settlement caused by adjacent parallel twin shield tunnel construction based on stochastic medium theory[J]. Rock and Soil Mechanics, 2016(Supp.2): 113-119. (in Chinese))