Analysis of Plane Attitude Control of Shield Tunneling Machine in Small Radius Curve Section

  • Huang Dawei ,
  • Yu Jue ,
  • Xu Changjie ,
  • Chen Houhong ,
  • Chen Kai
Expand
  • 1. State Key Laboratory of Safety and Resilience of Civil Engineering in Mountain Area, East China Jiaotong University, Nanchang 330013, P.R. China;
    2. Jiangxi Provincial Key Laboratory of Comprehensive Stereoscopic Traffic Information Perception and Fusion, East China Jiaotong University, Nanchang 330013, P.R. China

Received date: 2025-02-07

  Online published: 2025-10-17

Abstract

It is difficult to control the plane posture of shield tunneling machines during construction on small radius curved sections. In actual construction, construction person mainly determine the main parameters based on experience, and there is currently no relevant theoretical basis. This article analyzes the plane posture of shield tunneling machines and proposes a reasonable plane state for shield tunneling machines, that is, the cutter head of the shield tunneling machine passes through curved sections close to the outer boundary; When obtaining a reasonable plane posture of the shield tunneling machine, the relationship between the inner and outer jack travel of the shield tunneling machine can be obtained. During construction, as long as the pushing amount of the inner jack is controlled, the pushing amount of the outer jack can be obtained; A reasonable calculation method for the maximum over excavation amount of the shield machine under different top pushing amounts in the plane state of the shield machine is obtained; It is proposed to only perform over excavation on the inner side of the curve, without over excavation on both the upper and lower sides, and a calculation method for the extension of the over excavation knife at different angle positions is obtained. The results have laid the theoretical foundation for intelligent control of shield tunneling posture in curved sections.

Cite this article

Huang Dawei , Yu Jue , Xu Changjie , Chen Houhong , Chen Kai . Analysis of Plane Attitude Control of Shield Tunneling Machine in Small Radius Curve Section[J]. Chinese Journal of Underground Space and Engineering, 2025 , 21(5) : 1685 -1693 . DOI: 10.20174/j.JUSE.2025.05.24

References

[1] 余国武. 复合地层小半径曲线隧道盾构掘进参数统计分析[J]. 施工技术,2020,49(13):19-22. (Yu Guowu. Statistical Analysis of parametric statistics for Shield Tunneling of Small Radius Curved Tunnel in Composite Stratum[J]. Construction Technology, 2020, 49(13): 19-22(Tunneling Parameters).(in Chinese))
[2] 梁晗. 复合地层小半径曲线隧道盾构掘进关键技术研究[D]. 北京:北京交通大学,2020. (Liang Han. Research on Key Technologies of Shield Tunneling in Composite Strata with Small radius Curve [D] Beijing: Beijing Jiaotong University, 2020.(in Chinese))
[3] 尹苏江,严仕舜,裴柏铮,等. 岩质地层盾构施工控制参数分析[J]. 现代隧道技术,2021,58(4):218-223,236. (Yin Sujiang, Yan Shishun, Pei Bozheng, et al. Analysis of control parameters for shield tunneling construction in rocky formations [J]. Modern Tunnel Technology, 2021,58 (4): 218-223,236.(in Chinese))
[4] 万雨双. 富水砂层地质条件下小半径曲线盾构控制技术研究[D].北京: 中国铁道科学研究院,2022. (Wan Yushuang. Research on Control Technology of Small radius Curve Shield Tunneling under Geological Conditions of Rich Water Sand Layer [D]. Beijing: China Academy of Railway Sciences, 2022.(in Chinese))
[5] 陈亚军,吕涛,龙彪. 富水砂卵石地层小半径曲线盾构纠偏技术研究[J].企业技术开发,2019,38(6):25-27. (Chen Yajun, Lv Tao, Long Biao. Research on Small radius Curve Shield Tunneling Correction Technology in Rich Water Sand and Pebble Strata [J]. Enterprise Technology Development, 2019,38 (6): 25-27.(in Chinese))
[6] 潘孔晓. 小半径曲线盾构隧道施工技术[A]//2014中国城市地下空间开发高峰论坛论文集[C]. 2014:206-208,211.(Pan Kongxiao. Small radius curved shield tunnel construction technology [A]//Proceedings of the 2014 China Urban Underground Space Development Summit Forum [C]. 2014:206-208,211.(in Chinese))
[7] 区秀叶. 小半径地铁盾构区间施工技术[J]. 石家庄铁道大学学报(自然科学版),2013,26(增1):187-190. (Qu Xiuye. Construction Technology for Small radius Subway Shield Tunnel Sections [J]. Journal of Shijiazhuang Railway University (Natural Science Edition), 2013,26(Supp.1): 187-190.(in Chinese))
[8] 杨圆,王春松. 主动铰接盾构在连续小半径曲线中风化泥岩的掘进控制技术[J]. 隧道建设,2017,37(增1):189-193. (Yang Yuan, Wang Chunsong. Excavation control technology of weathered mudstone in continuous small radius curves using active articulated shield tunneling [J]. Tunnel Construction, 2017, 37 (Supp.1): 189-193.(in Chinese))
[9] 何寨兵,耶律根迪. 盾构机在小半径曲线段隧道掘进姿态纠偏施工技术[J]. 云南水力发电,2017,33(6):100-103. (He Zhaibing, Ye Lugendi. Construction technology of shield tunneling attitude correction in small radius curved section tunnel [J]. Yunnan Hydropower, 2017,33 (6): 100-103.(in Chinese))
[10] 徐俊. 盾构法施工最小曲线半径取值的研究[D]. 北京:北京交通大学, 2008. (Xu Jun. Research on the Value of Minimum Curve Radius in Shield Tunnel Construction [D]. Beijing: Beijing Jiaotong University, 2008.(in Chinese))
[11] 张海龙. 盾构隧道小曲线半径施工测量技术[J]. 石家庄铁道大学学报(自然科学版),2018,31(增2):39-41. (Zhang Hailong. Measurement technology for small curve radius construction of shield tunnel [J]. Journal of Shijiazhuang Railway University (Natural Science Edition), 2018,31 (Supp.2): 39-41(in Chinese))
[12] 江涛,林森,刘佳明,等. 小半径曲线地铁盾构隧道施工技术研究[A]//2012中国城市轨道交通关键技术论坛暨第三届中国(长春)国际轨道交通论坛论文集[C].2012:126-129. (Jiang Tao, Lin Sen, Liu Jiaming, et al. Research on Construction Technology of Small radius Curve Metro Shield Tunnels [A]// Proceedings of the 2012 China Urban Rail Transit Key Technology Forum and the 3rd China (Changchun) International Rail Transit Forum[C]. 2012: 126-129.(in Chinese))
[13] 宋剑. 软土地层盾构机掘进姿态及管片破损控制分析[D]. 北京:清华大学,2020. (Song Jian Analysis of the excavation posture and segment damage control of shield tunneling machines in soft soil layers [D]. Beijing: Tsinghua University, 2020.(in Chinese))
[14] 李建彪,王波,张波,等. 8.6 m级盾构小半径曲线主动铰接姿态纠偏技术[J]. 建筑技术开发,2020,47(19):81-83. (Li Jianbiao, Wang Bo, Zhang Bo, et al. Active Articulation Attitude Correction Technology for Small radius Curve of 8.6 m Shield Tunneling [J]. Architectural Technology Development, 2020, 47(19): 81-83.(in Chinese))
[15] 孙延伟,刘杰. 盾构机掘进姿态精确控制技术[J]. 广东建材,2008(7):228-230. (Sun Yanwei, Liu Jie. Precise control technology for shield tunneling posture [J]. Guangdong Building Materials, 2008 (7): 228-230.(in Chinese))
[16] 李海. 小半径曲线地铁隧道盾构法掘进技术[J]. 铁道建筑技术,2009(9):99-102. (Li Hai. Shield tunneling technology for small radius curved subway tunnel [J]. Railway Construction Technology, 2009 (9): 99-102.(in Chinese))
[17] 姜留涛,郭军. 地铁隧道小半径曲线段盾构割线始发预偏量控制方法[J]. 铁道建筑,2020,60(6):69-72. (Jiang Liutao, Guo Jun. Control method of shield secant departure pre deviation for small radius curved section of subway tunnel [J]. Railway Architecture, 2020,60 (6):69-72. (in Chinese))
Outlines

/