[1] 马伟斌. 铁路山岭隧道钻爆法关键技术发展及展望[J]. 铁道学报, 2022, 44(3): 64-85. (Ma Weibin, Development and prospect of key technology of drilling and blasting for railway mountain tunnels [J]. Journal of the China Railway Society, 2022, 44(3): 64-85. (in Chinese))
[2] 张继春, 曹孝君, 郑爽英, 等. 浅埋隧道掘进爆破的地表震动效应试验研究[J]. 岩石力学与工程学报, 2005(22): 4158-4163. (Zhang Jichun, Cao Xiaojun, Zheng Shuangying, et al. Experimental study on vibration effects of ground due to shallow tunnel blasting [J]. Chinese Journal of Rock Mechanics and Engineering, 2005(22): 4158-4163. (in Chinese))
[3] BERTA G. Blasting-induced vibration in tunneling[J]. Tunneling and Underground Space Technology, 1994(9): 175-187.
[4] 石洪超, 张继春. 并行小净距隧道楔形掏槽爆破振动效应研究[J]. 地下空间与工程学报, 2019, 15(2): 607-613, 621. (Shi Hongchao, Zhang Jichun. Blasting vibration effect of wedge cut blasting in parallel small-distance tunnel [J]. Chinese Journal of Underground Space and Engineering, 2019, 15(2): 607-613, 621. (in Chinese))
[5] 叶飞, 冯浩岚, 曹凯, 等. 近距离穿越古迹隧道爆破施工爆源参数优化[J]. 地下空间与工程学报, 2022, 18(4): 1292-1304, 1316. (Ye Fei, Feng Haolan, Cao Kai, et al. Optimization of blasting source parameters in blasting construction of close passing through historic site tunnel [J]. Chinese Journal of Underground Space and Engineering, 2022, 18(4): 1292-1304, 1316. (in Chinese))
[6] 高文学,侯俊杰,张三. 浅埋偏压隧道掘进爆破地表振动效应研究[J]. 工程爆破,2023, 29(6): 147-152(Gao Wenxue, Hou Junjie, Zhang San. Study on the surface vibration effects of shallow buried eccentric tunnel excavation blasting[J]. Engineering Blasting, 2023, 29(6): 147-152. (in Chinese))
[7] 杨年华, 张志毅. 隧道爆破振动控制技术研究[J]. 铁道工程学报, 2010, 27(1): 82-86. (Yang Nianhua, Zhang Zhiyi. Research on the control technology for tunnel blasting vibration[J]. Journal of Railway Engineering Society, 2010, 27(1): 82-86. (in Chinese))
[8] 陈义东, 王金国, 陈度军, 等. 地铁隧道电子雷管爆破降振技术及爆破参数优化[J]. 科学技术与工程, 2017, 17(27): 298-302. (Chen Yidong, Wang Jinguo, Chen Dujun, et al. Study of decreasing blasting vibration technology with digital detonator and parameters optimization in metro tunnel[J]. Science Technology and Engineering, 2017, 17(27): 298-302. (in Chinese))
[9] 邹新宽, 张继春, 潘强, 等. 楔形分段掏槽爆破减振效应研究[J]. 西南交通大学学报, 2018, 53(3): 450-458. (Zhou Xinkuan, Zhang Jichun, Pan Qiang, et al. Vibration reduction effect of stepped V-cut blasting[J]. Journal of Southwest Jiaotong University, 2018, 53(3): 450-458. (in Chinese))
[10] 李清, 于强, 张迪, 等. 地铁隧道精确控制爆破延期时间优选及应用[J]. 振动与冲击, 2018, 37(13): 135-140, 170. (Li Qing, Yu Qiang, Zhang Di, et al. Metro tunnel precisely controlled blasting's delay time optimization and its application[J]. Journal of Vibration and Shock, 2018, 37(13): 135-140, 170. (in Chinese))
[11] Huang D, Qiu X Y, Shi X Z, et al. Experimental and numerical investigation of blast-induced vibration for short-delay cut blasting in underground mining[J]. Shock and Vibration, 2019(2): 5843516.
[12] 傅洪贤, 沈周, 赵勇, 等. 隧道电子雷管爆破降振技术试验研究[J]. 岩石力学与工程学报, 2012, 31(3): 597-603. (Fu Hongxian, Shen Zhou, Zhao Yong, et al. Experimental study of decreasing vibration technology of tunnel with digital detonator [J]. Chinese Journal of Rock Mechanics and Engineering, 2012, 31(3): 597-603. (in Chinese))
[13] 龚敏, 吴昊骏, 孟祥栋, 等. 密集建筑物下隧道开挖微振控制爆破方法与振动分析[J]. 爆炸与冲击, 2015, 35(3): 350-358. (Gong Min, Wu Junhao, Meng Xiangdong, et al. A precisely-controlled blasting method and vibration analysis for tunnel excavation under dense buildings [J]. Explosion and Shock Waves, 2015, 35(3): 350-358. (in Chinese))
[14] 杨仁树, 车玉龙, 冯栋凯, 等. 切缝药包预裂爆破减振技术试验研究[J]. 振动与冲击, 2014, 33(12): 7-14. (Yang Renshu, Che Yulong, Feng Dongkai, et al. Tests for blasting vibration reduction technique with presplitting blasting of a slotted cartridge [J]. Journal of Vibration and Shock, 2014, 33(12): 7-14. (in Chinese))
[15] 刘京增. 复杂地质环境下大断面隧道控制爆破技术[J]. 公路, 2019, 64(3): 337-341. (Liu Jingzeng. Controlled blasting technology of large section tunnel under complex geological environment [J]. Highway, 2019, 64(3): 337-341. (in Chinese))
[16] 王海亮. 大直径中空孔直眼掏槽微振动爆破参数研究[J]. 隧道建设, 2015, 35(2): 174-179. (Wang Hailiang. Study on micro-vibration blasting parameters of large-diameter empty-hole parallel cut [J]. Tunnel Construction, 2015, 35(2): 174-179. (in Chinese))
[17] 吴昊骏, 龚敏. 基于雷管实际延时范围的逐孔爆破振动合成计算与应用[J]. 爆炸与冲击, 2019, 39(2): 151-161. (Wu Haojun, Gong Min. Calculation and application of hole by hole blasting vibration superposition based measured delay times of detonators [J]. Explosion and Shock Waves, 2019, 39(2): 151-161. (in Chinese))
[18] 肖维民, 李锐. 天然充填岩石节理抗剪强度模型研究进展[J]. 地下空间与工程学报, 2018, 14(增2): 725-736. (Xiao Weimin, Li Rue. Advances in shear strength models of natural infilled rock joints [J]. Chinese Journal of Underground Space and Engineering, 2018, 14(Supp. 2): 725-736. (in Chinese)).
[19] 康宏垚,孔艳婷,胡宇,等. 楔形掏槽分段延时爆破技术研究[J]. 中国矿业,2024, 33(增2): 330-335. (Kang Hongyao, Kong Yanting, Hu Yu, et al. Study on wedge cutting segmented delayed blasting technology [J]. China Mining Magazine, 2024. 33(Supp. 2): 330-335 (in Chinese))
[20] 王成, 冯锡勇. 隧道爆破施工对地表砖砌高烟囱影响的数值分析[J]. 地下空间与工程学报, 2015, 11(增2): 768-771. (Wang Chen, Feng Xiyong. Numerical analysis on the impact of the tunnel blasting construction on the surface high brick chimney [J]. Chinese Journal of Underground Space and Engineering, 2015, 11(Supp. 2): 768-771. (in Chinese))
[21] 马晨阳, 吴立, 孙苗. 自由面数量对水下钻孔爆破振动信号能量分布及衰减规律的影响[J]. 爆炸与冲击, 2022, 42(1): 145-156. (Ma Chenyang, Wu Li, Sun Miao. Influence of free surface numbers on the energy distribution and attenuation of vibration signals of underwater drilling blasting [J]. Explosion and Shock Waves, 2022, 42(1): 145-156. (in Chinese))
[22] 龚敏, 石发才, 吴晓东. 基于叠加和频谱分析的电子雷管延期时间研究[J]. 振动与冲击, 2019, 38(15): 134-141. (Gong Min, Shi Facai, Wu Xiaodong. Delay time of electronic detonators based on superposition and frequency spectral analysis [J]. Journal of Vibration and Shock, 2019, 38(15): 134-141. (in Chinese))
[23] 张学峰. 集合卡尔曼滤波数据同化方法在海温数值预报中的应用研究[D]. 杭州:浙江大学,2005. (Zhang Xuefeng. Collection of the Kalman filter data assimilation methods in the numerical prediction of the sea surface temperature [D]. Hangzhou: Zhejiang University, 2005. (in Chinese))
[24] 唐冲, 惠辉辉. 基于Matlab的高斯曲线拟合求解[J]. 计算机与数字工程, 2013, 41 (8): 1262-1263, 1297. (Tang Chong, Hui Hhuihui. Gaussian curve fitting solution based on Matlab [J]. Computer & Digital Engineering, 2013, 41 (8): 1262-1263, 1297. (in Chinese))