[1] 宋森森,霍润科.铁路隧道空孔直线掏槽爆破方案优化研究及应用[J].爆破,2023,40(4):66-72+81.(Song Sensen, Huo Runke. Optimization research and application of burn cut blasting with empty hole for railway tunnel[J]. Blasting,2023,40(4):66-72+81. (in Chinese))
[2] Song S S, Li S G, Liang Y L, et al. Study on construction mechanical effect and optimization of large-span variable cross-section of railway tunnel[J]. Buildings, 2023, 13(11): 2859.
[3] 方俊波, 刘洪震, 翟进营. 山岭隧道爆破施工技术的发展与展望[J]. 隧道建设(中英文), 2021, 41(11): 1980-1991. (Fang Junbo, Liu Hongzhen, Zhai Jinying. Development and prospect of blasting technology for Mountain-Crossing tunnels[J]. Tunnel Construction, 2021, 41(11): 1980-1991. (in Chinese)).
[4] 任文斌,付晓强,俞缙. 小近距隧道台阶法开挖爆破振动信号特征分析[J]. 工程爆破, 2022, 28(6):119-129.(Ren Wenbin, Fu Xiaoqiang, Yu Jin. Characteristic analysis of blasting vibration signal in small-clearance tunnel excavation by bench method[J]. Engineering Blasting, 2022, 28(6): 119-129. (in Chinese)).
[5] 倪昊.竖井二氧化碳“二阶二段”筒形掏槽爆破技术及应用[J].煤炭科学技术,2023,51(10):65-71. (Ni Hao. Research on the technology and application of carbon dioxide two-step barrel cut blasting in coal mine shaft[J]. Coal Science and Technology,2023,51(10):65-71. (in Chinese))
[6] 张宪堂, 董国庆, 余辉, 等. 围压下空孔直径对直眼掏槽爆破振动的影响[J]. 山东科技大学学报(自然科学版), 2023, 42(3): 44-52. (Zhang Xiantang, Dong Guoqing, Yu Hui, et al. Influence of empty hole diameters on blasting vibration of parallel cut under confining pressure[J]. Journal of Shandong University of Science and Technology (Natural Science), 2023, 42(3): 44-52. (in Chinese))
[7] Zhang X T, Li J, Li D, et al. Numerical simulation of parallel cutting with different number of empty holes[J]. Tehnički Vjesnik-Technical Gazette, 2021, 28(5): 1742-1748.
[8] 冀玉豪, 李文杰, 康兰方, 等. 基于空孔效应的坚硬岩石涨裂破岩力学特性研究[J]. 爆破, 2023, 40(2): 53-60. (Ji Yuhao, Li Wenjie, Kang Lanfang, et al. Research on mechanical characteristics of rigid rock spallation and fracturing rock based on empty hole effect[J]. Blasting, 2023, 40(2): 53-60. (in Chinese))
[9] 李祥龙, 张志平, 王建国, 等. 双空孔间距对爆破槽腔断面大小的影响[J]. 爆炸与冲击, 2022, 42(11): 133-144. (Li Xianglong, Zhang Zhiping, Wang Jiangu, et al. Influence of double empty hole spacing on section size of blasting chamber[J]. Explosion and Shock Waves, 2022, 42(11): 133-144. (in Chinese))
[10] Zhao J J, Zhang Y, Ranjith P G. Numerical simulation of blasting-induced fracture expansion in coal masses[J]. International Journal of Rock Mechanics and Mining Sciences, 2017, 100: 28-39.
[11] Han W, Jiang Y J, Luan H J, et al. Numerical investigation on the shear behavior of rock-like materials containing fissure-holes with FEM-CZM method[J]. Computers and Geotechnics, 2020, 125: 103670.
[12] 陈璐, 周子龙, 高山, 等. 高应力隧道爆破研究现状与展望[J]. 中南大学学报(自然科学版), 2023, 54(3): 849-865. (Chen Lu, Zhou Zilong, Gao Shan, et al. Research status and prospects of blasting excavation of tunnel under high stress condition[J]. Journal of Central South University (Science and Technology), 2023, 54(3): 849-865. (in Chinese))
[13] Gao J, Xie S Z, Zhang X T, et al. Study on the 2D optimization simulation of complex five-hole cutting blasting under different lateral pressure coefficients[J]. Complexity, 2020, 2020(1): 1-12.
[14] Wu Z Y, Luo D Y, Chen F, et al. Numerical simulation of empty-hole effect during parallel-hole cutting under different in situ stress conditions[J]. Advances in Civil Engineering, 2021, 2021: 1-11.
[15] 蒋克文, 王海亮, 郭建,等. 大空孔直眼掏槽有效应力分布规律模拟研究[J]. 煤炭技术, 2023, 42(7): 30-34. (Jiang Kewen, Wang Hailiang, Guo Jian, et al. Numerical simulation of effective stress distribution law of large hollow hole straight hole cutting[J]. Coal Technology, 2023, 42(7): 30-34. (in Chinese))
[16] 张伟, 褚夫蛟, 王银刚, 等. 空孔在硬岩光面爆破作用中的试验与应用[J]. 爆破, 2023, 40(2): 48-52+137. (Zhang Wei, Chu Fujiao, Wang Yingang, et al. Experiment and application of empty hole in smooth blasting of hard rock[J]. Blasting, 2023, 40(2): 48-52+137. (in Chinese))
[17] 王玮, 怀平生, 降世良. 大断面隧道空孔直线掏槽爆破高效掘进方法[J]. 爆破, 2022, 39(3): 76-81. (Wang Wei Huai Pingsheng, Jiang Shiliang, et al. Efficient driving method for large section tunnel by burn cut blasting with uncharged holes[J]. Blasting, 2022, 39(3): 76-81. (in Chinese))
[18] 张召冉, 陈华义, 矫伟刚, 等. 含空孔直眼掏槽空孔效应及爆破参数研究[J]. 煤炭学报, 2020, 45(增2): 791-800. (Zhang Zhaoran, Chen Huayi, Jiao Weigang, et al. Rock breaking mechanism and blasting parameters of straight-hole cutting with empty-hole[J]. Journal of China Coal Society, 2020, 45(Supp.2): 791-800. (in Chinese))
[19] 刘国强, 刘彬, 张庆明,等. 岩溶隧道光面爆破参数优化及其应用研究[J]. 隧道建设(中英文), 2021, 41(增2): 50-57. (Liu Guoqiang, Liu Bin, Zhang Qingming, et al. Parameter optimization of smooth blast in karst tunnel and iIts application[J]. Tunnel Construction, 2021, 41(Supp.2): 50-57. (in Chinese))
[20] Zhang P, Cai J H, Zong F, et al. Dynamic response analysis of underground double-line tunnel under surface blasting[J]. Shock and Vibration, 2021, 2021: 1-13.
[21] Li S G, Song S S, Miao Z Z, et al. Deterioration characteristics and damage constitutive model of granite-shotcrete under acid corrosion cycle conditions[J]. Journal of BuildingEngineering, 2024, 85: 108729.
[22] 娄乾星,陶铁军,田兴朝,等.基于HJC本构模型的石灰岩冲击破坏形态数值模拟方法研究[J].爆破,2022,39(4):71-79. (Lou Qianxing, Tao Tiejun, Tian Xingchao, et al. Research on numerical simulation method of limestone impact failure based on HJC constitutive model[J]. Blasting, 2022,39(4):71-79. (in Chinese))
[23] 陈玉, 黄国栋, 马龙浩, 等. 砂岩隧道全断面光面爆破一次成形技术研究[J].地下空间与工程学报, 2021, 17(增1): 283-290. (Chen Yu, Huang Guodong, Ma Longhao, et al. Study on one-time forming technology of full-face smooth blasting in sandstone tunnel[J]. Chinese Journal of Underground Space and Engineering, 2021 ,17(Supp.1): 283-290. (in Chinese))
[24] Jiang N, Zhu B, He X, et al. Safety assessment of buried pressurized gas pipelines subject to blasting vibrations induced by metro foundation pit excavation [J]. Tunnelling and Underground Space Technology, 2020, 102: 103448.
[25] 黄佑鹏, 王志亮, 毕程程. 岩石爆破损伤范围及损伤分布特征模拟分析[J]. 水利水运工程学报, 2018 (5): 95-102. (Huang Youpeng, Wang Zhiliang, Bi Chengcheng. Simulation analysis of blast-induced damage scope and its distribution characteristics of rocks[J]. Hydro-Science and Engineering, 2018 (5): 95-102. (in Chinese))
[26] Xu X D, He M C, Zhu C, et al. A new calculation model of blasting damage degree-based on fractal and tie rod damage theory[J]. Engineering Fracture Mechanics, 2019, 220: 106619.
[27] Allen M R. An analysis of burn cut pull optimization through varying relief hole depths [D]. Missouri University of Science and Technology, 2014.
[28] 王文龙. 钻眼爆破[M]. 北京: 中国煤炭工业出版社, 1984.
[29] Zou D X. Theory and technology of rock excavation for civil engineering[M]. Singapore: Springer Singapore, 2017.