In order to study the influence of foundation pit excavation on the vertical displacement of the vault of the underlying tunnel under different control measures, based on the Erqi Square Tunnel Project in Zhengzhou City, on the basis of verifying the reliability of numerical calculation, the finite difference software MIDAS GTS was used to analyze the deformation law of the vertical displacement of the tunnel vault under the two measures of stratum reinforcement and back pressure. The orthogonal test method was used to study the influence of reinforcement width, reinforcement depth, back pressure width and back pressure load on the vertical displacement of the tunnel vault. The results show that in similar projects, with the increase of the width and depth of the bottom reinforcement of the upper foundation pit, the vertical displacement of the vault of the underlying subway shield tunnel decreases nonlinearly, and the width coefficient i of the longitudinal deformation curve fitting function increases nonlinearly. With the increase of back pressure load and back pressure range, the vertical displacement of the vault of the underlying subway shield tunnel decreases linearly. The influence of the reinforcement depth of the pit bottom on the underlying subway shield tunnel is in turn greater than the back pressure load, the reinforcement width and the back pressure width. In the design of pit bottom reinforcement, it is recommended that the reinforcement width and reinforcement depth are easily set to 0.3 times and 0.4 times of the excavation depth of the foundation pit. In the comprehensive design of bottom reinforcement and back pressure surcharge, considering the deformation control effect, construction process and construction cost, among the 16 schemes of orthogonal test, scheme 4 and scheme 15 have the best control effect. The construction cost of scheme 4 is lower than that of scheme 15, and the deformation control effect of scheme 15 is better than that of scheme 4. The above suggestions can provide design basis for similar projects under silty clay or silty soil layer conditions.
Tian Shuai
,
Li Haoqiang
,
Lin Yunhong
,
Li Mingyu
,
Cao Guoxu
. Analysis of Back Pressure Reinforcement of Underground Passage Excavation on the Deformation of Subway Shield Tunnel[J]. Chinese Journal of Underground Space and Engineering, 2024
, 20(S2)
: 924
-930
.
DOI: 10.20174/j.JUSE.2024.S2.48
[1] Meng F, Chen R, Xu Y, et al. Contributions to responses of existing tunnel subjected to nearby excavation: A review [J]. Tunnelling and Underground Space Technology, 2022, 119: 104195.
[2] 刘波, 章定文, 李建春. 基于多案例统计的基坑开挖引起侧方既有隧道变形预测公式及其工程应用[J]. 岩土力学, 2022, 43(增1): 501-512.
[3] Zhao Y, Chen X,Hu B, et al. Evolution of tunnel uplift induced by adjacent long and collinear excavation and an effective protective measure [J]. Tunnelling and Underground Space Technology, 2023, 131: 104846.
[4] Li M G, Chen J J, Wang J H, et al. Comparative study of construction methods for deep excavations above shield tunnels[J]. Tunnelling and Underground Space Technology, 2018, 71: 329-339.
[5] Wu H N, Lan G Z, Liu Y, et al. Field performance of an anti-uplift portal frame in control of the tunnel uplift induced by overlying excavation [J]. Tunnelling and Underground Space Technology, 2023, 132: 104908.
[6] Shi J, Ng C, Chen Y. Three-dimensional numerical parametric study of the influence of basement excavation on existing tunnel [J]. Computers and Geotechnics, 2015, 63: 146-158.
[7] 施有志, 刘旭东, 赵朋, 等. 基坑零距离上跨盾构隧道的环境影响与控制[J]. 科学技术与工程, 2022, 22(18): 8110-8121.
[8] 李连祥, 张永磊, 扈学波. 基于 PLAXIS 3D 有限元软件的某坑中坑开挖影响分析[J]. 地下空间与工程学报, 2016, 12(增1): 254-261.
[9] 胡建林, 孙利成, 崔宏环, 等. 基于修正摩尔库伦模型的深基坑变形数值分析[J]. 科学技术与工程, 2021, 21(18): 7717-7723.
[10] 李晓军, 黄伯麒, 杨志豪, 等. 不同埋深下大直径盾构隧道横向刚度有效率[J]. 同济大学学报: 自然科学版, 2015, 43(8): 1159-1166.
[11] 郑刚. 软土地区基坑工程变形控制方法及工程应用[J]. 岩土工程学报, 2022, 44(1): 1-36.
[12] 中华人民共和国建设部. 全国统一建筑工程预算工程量计算规则(GJDGZ-101-95)[S]. 北京:中国计划出版社, 1995.