[1] 王新强, 晏启祥, 孙明辉, 等. 盾构隧道同步注浆对管片上浮的影响分析[J]. 铁道建筑, 2022, 62(2):118-122. (Wang Xinqiang, Yan Qixiang, Sun Minghui, et al. Influence of synchronous grouting on segment floating in shield tunnel[J]. Railway Construction, 2022, 62 (2): 118-122.(in Chinese))
[2] 李明宇, 吴龙骥, 赵世永, 等.盾构管片上浮量变化规律及简化算法研究[J]. 公路, 2021, 66(3): 337-341. (Li Mingyu, Wu Longji, Zhao Shiyong, et al. Research on the simplified calculation method of segment uplift of shield tunnel[J]. Highway, 2021, 66 (3): 337-341.(in Chinese))
[3] 肖明清, 封坤, 周子扬, 等. 盾构隧道施工期管片错台影响因素研究[J]. 岩土工程学报, 2022, 45(7): 1347-1356. (Xiao Mingqing, Feng Kun, Zhou Ziyang, et al. Study on the influencing factors for segment dislocation during shield tunnelling[J]. Chinese Journal of Geotechnical Engineering, 2022, 45(7): 1347-1356.(in Chinese))
[4] 付艳斌, 梅超, 卞跃威, 等. 考虑注浆填充率的大直径盾构管片上浮解析解与应用[J]. 中国公路学报, 2022, 35(11):171-179. (Fu Yanbin, Mei Chao, Bian Yuewei, et al. Analytical solution and application of large- diameter shield segment uplift considering the filling rate of grouting[J]. China Journal of Highway Transportation, 2022, 35 (11): 171-179.(in Chinese))
[5] 傅鹤林, 史越, 陈俐光, 等. 盾构隧道施工期管片上浮机理数值模拟研究[J]. 中外公路, 2019, 39(1):174-179.(Fu Helin, Shi Yue, Chen Liguang, et al. Numerical simulation study on the floating mechanism of segment during shield tunnel construction[J]. Journal of China & Foreign Highway, 2019, 39 (1): 174-179.(in Chinese))
[6] 胡辉, 张恒, 刘晓迪, 等. 泥岩地层盾构隧道施工管片上浮影响因素分析[J]. 公路, 2018, 63(12):312-318.(Hu Hui, Zhang Heng, Liu Xiaodi, et al. Analysis on influencing factors of segment floating in construction of shield tunnel in mudstone stratum[J]. Highway, 2018, 63 (12): 312-318.(in Chinese))
[7] 董赛帅, 杨平, 姜春阳, 等. 盾构隧道管片上浮机理与控制分析[J]. 地下空间与工程学报, 2016, 12(1):49-54.(Dong Saishuai, Yang Ping, Jiang Chunyang, et al. Analysis of mechanism and controls of segment floating of shield tunnels[J]. Chinese Journal of Underground Space and Engineering, 2016, 12 (1): 49-54.(in Chinese))
[8] 杨志勇, 杨星, 张长旺,等. 盾构管片上浮量理论计算模型及上浮控制措施研究[J]. 矿业科学学报, 2021, 6(5):591-597, 605.(Yang Zhiyong, Yang Xing, Zhang Changwang, et al. Research on theoretical calculation model of shield segments floating amount and floating control measures[J]. Journal of Mining Science and Technology, 2021, 6 (5): 591-597, 605.(in Chinese))
[9] 陈仁朋, 刘源, 刘声向,等. 盾构隧道管片施工期上浮特性[J]. 浙江大学学报:工学版, 2014, 48(6):1068-1074.(Chen Renpeng, Liu Yuan, Liu Shengxiang, et al. Characteristics of upward moving for lining during shield tunnelling construction[J]. Journal of Zhejiang University (Engineering Science), 2014, 48 (6): 1068-1074.(in Chinese))
[10] 吕乾乾, 周建军, 杨振兴, 等. 基于地基回弹因素的盾构隧道管片上浮预测[J].隧道建设(中英文), 2017, 37(增2):87-93.(Lü Qianqian, Zhou Jianjun, Yang Zhenxing, et al. Prediction of shield tunnel segment up-floating caused by formation rebound[J]. Tunnel Construction, 2017, 37 (Supp.2): 87-93.(in Chinese))
[11] 舒瑶, 季昌, 周顺华, 等. 考虑地层渗透性的盾构隧道施工期管片上浮预测[J]. 岩石力学与工程学报, 2017, 36(增1):3516-3524.(Shu Yao, Ji Chang, Zhou Shunhua, et al. Prediction for shield tunnel segment uplift considering the effect of stratum permeability[J]. Chinese Journal of Rock Mechanics and Engineering, 2017, 36 (Supp.1): 3516-3524.(in Chinese))
[12] 贾少东, 马杲宇, 王士民, 等. 考虑注浆压力的泥岩地层管片上浮特性与控制[J]. 铁道标准设计, 2022, 66(2):72-78.(Jia Shaodong, Ma Gaoyu, Wang Shimin, et al. Floating properties and control of segments in mudstone stratum considering grouting pressure[J]. Railway Standard Design, 2022, 66(2):72-78. (in Chinese))
[13] 施有志, 阮建凑, 林树枝, 等. 海底盾构隧道管片上浮分析及控制研究[J]. 地下空间与工程学报, 2022, 18(5):1665-1677.(Shi Youzhi, Ruan Jiancou, Lin Shuzhi, et al. Floating analysis and control of subsea shield tunnel segment[J]. Chinese Journal of Underground Space and Engineering, 2022, 18 (5): 1665-1677. (in Chinese))
[14] 叶飞. 软土盾构隧道施工期上浮机理分析及控制研究[D].上海:同济大学,2007.(Ye Fei. Analysis and control for upward movement of shield tunnel during construction[D]. Shanghai: Tongji University, 2007.(in Chinese))
[15] 李培楠,英旭,石来,等.基于CFD的盾构同步注浆填充扩散运动力学分析[J].地下空间与工程学报,2021,17(增1):126-132.(Li Pennan,Ying Xu,Shi Lai,et al.Hydrodynamics analysis on fill diffusion in shield synchronous grouting based on CFD[J].Chinese Journal of Underground Space and Engineering,2021,17(Supp.1):126-132.(in Chinese))
[16] 李涛,王颖轶,黄醒春.基于冲击映像法盾构同步注浆效果检测与评价[J].地下空间与工程学报,2022,18(6):1962-1967,1978.(Li Tao,Wang Yingyi,Huang Xingchun,et al.Detection and evaluation of shield synchronous grouting effect based on impact image metho[J].Chinese Journal of Underground Space and Engineering,2022,18(6):1962-1967,1978.(in Chinese))
[17] 王涵. 大直径盾构隧道管片上浮机理与施工控制研究[D]. 济南:山东大学, 2022.(Wang Han. Study on segment uplifting displacement mechanism and control measures of large diameter shield tunnel[D]. Jinan: Shandong University, 2022.(in Chinese))
[18] Tananashi H. Formulas for an infinitely long bernoulli-euler beam on the pasternak model[J]. Journal of the Japanese Geotechnical Society, 2004, 44(5): 109-118.
[19] Liang R, Wu W, Yu F, et al. Simplified method for evaluating shield tunnel deformation due to adjacent excavation[J]. Tunnelling and Underground Space Technology, 2018, 71: 94-105.
[20] Yu J, Zhang C, Huang M. Soil-pipe interaction due totunnelling: Assessment of winkler modulus for underground pipelines[J]. Computers and Geotechnics,2013, 50:17-28.
[21] 徐凌.软土盾构隧道纵向沉降研究[D].上海:同济大学, 2005. (Xu Ling. Research on longitudinal settlement of soft soil shield tunnels[D]. Shanghai: Tongji University, 2005.(in Chinese))
[22] 徐凯. 砂卵石地层叠线小净距盾构隧道管片结构受力特征与松动土压力计算方法研究[D]. 成都:西南交通大学, 2021.(Xu Kai. Study on mechanical characteristics of segment structure and calculation method of loose earth pressure of shield tunnel with small spacing in sand cobble stratum[D]. Chengdu: Southwest Jiaotong University, 2021.(in Chinese))