[1]王梦恕. 中国盾构和掘进机隧道技术现状、存在的问题及发展思路[J]. 隧道建设, 2014, 34(3): 179-187.(Wang Mengshu. Tunneling by TBM/shield in China: state-of-art, problems and proposals[J]. Tunnel Construction, 2014, 34(3): 179-187.(in Chinese))
[2]《中国公路学报》编辑部. 中国交通隧道工程学术研究综述·2022[J]. 中国公路学报, 2022, 35(4): 1-40.(Editorial Department of China Journal of Highway and Transport. Review on China's traffic tunnel engineering research:2022[J]. China Journal of Highway and Transport, 222,35(4): 1-40.(in Chinese))
[3]Fountaine E R. Investigations into the mechanism of soil adhesion[J]. Journal of Soil Science, 1954, 5(2): 251-263.
[4]Basmenj A K, Ghafoori M, Cheshomi A. Adhesion of clay to metal surface: normal and tangential measurement[J]. Geomechanics and Engineering, 2016, 10(2): 125-135.
[5]杨益, 朱文骏, 李兴高, 等. 老黏土地层土压盾构刀盘堵塞渣土改良效果评价方法[J]. 北京交通大学学报, 2019, 43(6): 43-49. (Yang Yi, Zhu Wenjun, Li Xinggao, et al. Evaluation method for muck conditioning of hard clay to prevent clogging in EPB tunnelling[J]. Journal of Beijing Jiaotong University, 2019, 43(6): 43-49.(in Chinese))
[6]Feinendegen M, Ziegler M, Spagnoli G, et al. Evaluation of the clogging potential in mechanical tunnel driving with EPB-shields[A]//Proceedings of the 15th European Conference on Soil Mechanics and Geotechnical Engineering[C]. Amsterdam:IOS Press, 2011: 1633-1638.
[7]Spagnoli G, Feinendegen M, Heuser M. A study on the adhesion of clays during mechanized tunnel excavation[C]//XXIV Convegno Nazionale di Geotecnica, 2011: 283-290.
[8]贺雄飞, 张迅, 李治国, 等. 盾构施工新型防结泥饼泡沫剂的研制与应用[J]. 隧道建设(中英文), 2019, 39(6): 925-933.(He Xiongfei, Zhang Xun, Li Zhiguo, et al. Development and application of new foam agent for anti-clogging of shield tunneling[J]. Tunnel Construction, 2019,39 (6):925-933.(in Chinese))
[9]李志军, 翟志国, 赵康林. 泥水盾构刀盘结泥饼形成原因及防治技术[J]. 地下空间与工程学报, 2014, 10(增2): 1866-1871.(Li Zhijun, Zhai Zhiguo, Zhao Kanglin. Causes of mud cake formation on cutter head of slurry shield and its control technology[J]. Chinese Journal of Underground Space and Engineering, 2014,10 (Supp.2):1866-1871.(in Chinese))
[10]钟长平, 竺维彬, 周翠英. 花岗岩风化地层中盾构施工风险和对策研究[J]. 现代隧道技术, 2013, 50(3): 17-23. (Zhong Changping, Zhu Weibin, Zhou Cuiying. On construction risks of a shield machine operated in weathered granite stratum and its countermeasures[J]. Modern Tunnelling Technology, 2013, 50(3): 17-23.(in Chinese))
[11]杜昌言, 王超. 国内直径最大公轨合建盾构隧道——济南黄河隧道工程介绍[J]. 隧道与地下工程灾害防治, 2019, 1(2): 124-127.(Du Changyan, Wang Chao. The introduction of Jinan Yellow River Tunnel Project with the Largest diameter combined rail shield Tunnel [J]. Tunnel and Underground Engineering Disaster Prevention and Control, 2019,1 (2):124-127.(in Chinese))
[12]张宏伟, 金平, 刘朋飞, 王等. 深圳风化花岗岩地层盾构防泥饼渣土改良技术[J]. 施工技术, 2019, 48(17): 62-66, 80.(Zhang Hongwei, Jin Ping, Liu Pengfei, et al. Improvement technology of sludge-proof cake residue for EPB shield driving in weathered granite stratum in shenzhen[J] Construction Technology, 2019, 48 (17): 62-66,80.(in Chinese))
[13]竺维彬, 鞠世健, 张弥, 等. 广州地铁二号线旧盾构穿越珠江的工程难题及对策[J]. 土木工程学报, 2004(1): 56-60.(Zhu Weibin, Ju Shijian, Zhang Mi, et al. On theengineering poser and countermeasure of driving and crossing the Pearl River with two used TBMs in Guangzhou metro line of No.2[J]. China Civil Engineering Journal, 2004(1): 56-60.(in Chinese))
[14]严辉. 盾构隧道施工中刀盘泥饼的形成机理和防治措施[J]. 现代隧道技术, 2007,44(4): 24-27,35. (Yan Hui. Mechanism of the formation and the prevention of clay cake in shield tunneling[J]. Modern Tunnelling Technology, 2007, 44(4): 24-27, 35. (in Chinese))
[15]董祥宽. 重庆复合式TBM刀盘防结泥饼技术[J]. 隧道建设, 2012, 32(增2): 101-104.(Dong Xiangkuan. Research on the key elements of the combined TBM in the Chongqing metro[J]. Tunnel Construction, 2012, 32(Supp.2): 101 - 104.(in Chinese))
[16]杨金钟,魏斌效,田利锋. 辐条式刀盘在砂卵石地层的泥饼成因及处理措施[A]//2011中国盾构技术学术研讨会论文集[C]. 北京:市政技术, 2011: 53-55. (Yang Jinzhong, Wei Binxiao, Tian Lifeng. Causes of mud cake and countermeasures of spoke cutter in sand and cobble layer[A]//Proceedings of 2011 China shield machine technology symposium[C].Beijing:Municipal Technology Magazine, 2011: 53-55. (in Chinese))
[17]康洪信. 硬塑黏土层盾构干碴出土施工技术研究[J]. 铁道建筑技术, 2016(增1): 248-251.(Kang Hongxin.Shield machine dry soil excavating technologies in hardplastic clay layer[J]. Railway Construction Technology,2016(Supp.1): 248-251.(in Chinese))
[18]侯凯文, 王崇, 江杰, 等. 南宁地铁2 号线盾构选型设计与适应性分析[J]. 隧道建设, 2017(8): 1037-1045. (Hou Kaiwen, Wang Chong, Jiang Jie, et al. Typeselection design and adaptability analysis of shield used in line No.2 of Nanning metro[J]. Tunnel Construction, 2017(8): 1037-1045.(in Chinese))
[19]杨益,李兴高.盾构刀盘结泥饼问题研究进展[J].地下空间与工程学报,2020,16(增2):1030-1038. (Yang Yi, Li Xinggao. Review on the issue of clogging occurred in shield tunneling[J]. Chinese Journal of Underground Space and Engineering, 2020 ,16 (Supp.2): 1030-1038. (in Chinese))
[20]Peila D,Picchio A, Chieregato A. Earth pressure balance tunnelling in rock masses: laboratory feasibility study of the conditioning process[J]. Tunnelling and Underground Space Technology, 2013, 35: 55-66.
[21]Fu J, Wu D, Lan H, et al. Online monitoring and analysis of TBM cutter temperature: a case study in China[J]. Measurement, 2021, 174: 109034.
[22]Tsuchida T, Kobayashi M, Mizukami J. Effect of aging of marine clay and its duplication by high temperature consolidation[J]. Soils and Foundations, 1991, 31(4): 133-147.
[23]Habibagahi K. Temperature effect and the concept of effective void ratio[J]. Indian Geotechnical Journal, 1977, 7(1): 14-34.
[24]肖国强. 深部粘性土高压固结机理与地面沉降过程研究——以天津滨海新区G2孔为例[D]. 武汉:中国地质大学, 2014.( Xiao Guoqiang. Study on mechanism of clayey soil by high pressure consolidation and process of land subsidence a case study of the G2 geologic drill-hole in Tianjin Binhai New Area[D]. Wuhan: China University of Geosciences, 2014.(in Chinese))
[25]邓如勇. 盾构刀盘结泥饼的机理及处置措施研究[D]. 成都:西南交通大学, 2018.(Deng Ruyong. Study on mechanism and disposal measures of clay clogging in TBM cutter-head [D]. Chengdu: Southwest Jiaotong University, 2018.(in Chinses))
[26]Habibagahi K.Temperature effect and the concept of effective void ratio[J].Indian Geotechnical Jounal,1977(1): 14-34.
[27]王媛, 施斌, 高磊,等.黏性土渗透性温度效应实验研究[J]. 工程地质学报. 2010, 18(3): 351-356.(Wang Yuan, Shi Bin, Gao Lei, et al. Laboratory tests for temperature effects of clayey soil permeability[J]. Journal of Engineering Geology, 2010, 18 (3): 351-356.(in Chinese))
[28]毛伟赟,邓岳保.考虑固结压力和加热温度影响的软土次固结系数[J].工程勘察,2021,49(2):19-24,73. (Mao Weiyun, Deng Yuebao. Influence of consolidation pressure and heating temperature on secondary consolidation coefficient of soft clay[J]. Geotechnical Investigation&Surveying, 2021, 49 (2): 19-24,73.(in Chinese))
[29]王良玉,刘宝臣,杨柏,等.不同黏粒含量红黏土失水与开裂关联性分析[J].地下空间与工程学报,2023,19(3):804-814.(Wang Liangyu,Liu Baochen,Yang Bai,et al.Correlation analysis between water loss and cracking of red clay with different clay content[J].Chinese Journal of Underground Space and Engineering,2023,19(3):804-814.(in Chinese))
[30]Ying K, Pan X, Lian M, et al.Effect of soil-cutterhead interface temperature on the consolidation and hardening of mud cake under multi-factor conditions[J]. Arabian Journal for Science and Engineering, 2023, 48: 12931-12943.
[31]徐杰. 高岭-蒙脱混合黏土渗透各向异性研究[D]. 杭州:浙江大学, 2019.(Xu Jie. Permeability anisotropy of kaolin-montmorillonite mixed clays [D]. Hangzhou: Zhejiang University, 2019.(in Chinese))
[32]张亚彬,左双英,李雨霏,等.红黏土失水收缩孔隙演化及微观机理分析[J].地下空间与工程学报,2022,18(6):1882-1890.(Zhang Yabin,Zuo Shuangying,Li Yufei,et al.Analysis on pore evolution and microscopic mechanism of red clay during loss water and shrinkage[J].Chinese Journal of Underground Space and Engineering,2022,18(6):1882-1890.(in Chinese))
[33]中华人民共和国住房和城乡建设部,国家市场监督管理总局. 土工试验方法标准(GB/T 50123—2019)[S]. 北京: 中国计划出版社, 2019. (Ministry of Housing and Urban-Rural Development of the People's Republic of China, State Administration for Market Regulation. Standard of geotechnical testing method (GB/T 50123—2019)[S]. Beijing: China Planning Press, 2019. (in Chinese))
[34]Thewes M, Buger W. Clogging risks for TBM drives in clay[J]. Tunnels & Tunnelling,2004,36: 28-31.
[35]傅鑫晖,莫涛,张晨,等.复合地层盾构机刀盘结泥饼成因及预防措施[J].地下空间与工程学报,2020,16(增2):864-869.(Fu Xinhui,Mo Tao,Zhang Chen,et al.Formation and precautions of mud cakes in mixed strata[J].Chinese Journal of Underground Space and Engineering,2020,16(Supp.2):864-869.(in Chinese))