Research on the Construction Scheme of Underground Transportation Hub Based on the Combined Method of Cover and Open Excavation

  • Guo Fei ,
  • Li Zhaoping ,
  • Han Xuegang ,
  • Cui Xiangyang ,
  • Song Jianping
Expand
  • 1. Beijing Municipal Engineering Group Co., Ltd., Beijing, 100089, P.R. China;
    2. School of Civil Engineering, Beijing Jiaotong University, Beijing 100044, P.R. China

Received date: 2023-10-21

  Online published: 2024-05-09

Abstract

In order to meet the need of the urban road above the underground traffic hub of Beijing sub-center put into operation first, a construction scheme combining cover excavation and open excavation is proposed. The main characteristics of the scheme are as follows: 1) The foundation pit of the underground transportation hub is divided into three parallel layout pits, namely “cover excavation pit, open excavation pit and slope excavation pit”;2) The supporting structure is shared between cover excavation pit and open excavation pit;3) First, the roof structure construction of the cover excavation area is completed to resume the urban road operation as soon as possible, and the negative layer construction of the cover excavation area is carried out by the reverse method, and then the open excavation pit and the slope excavation pit on both sides of the cover excavation area are simultaneously excavated;4) The negative second floor and negative third floor of the cover excavation area is constructed by open excavation method. The paper elaborated the construction procedure of the combined method of cover cut and open cut and analyzed the advantages of the combined method. Considering that the steel tube column in the cover excavation area is always disturbed by the excavation of the foundation pit, the deformation law of the steel tube column during the excavation of the foundation pit is analyzed by the numerical simulation method combined with the site monitoring results. The results show that the horizontal deformation and uplift deformation of steel tube column meet the control requirements. The combined construction scheme of cover cut and open cut proposed in this paper can not only ensure that the urban roads in the underground transportation hub area can be put into operation as soon as possible, but also each foundation pit excavation and structure pouring are basically independent of each other, effectively reducing the mutual influence of the foundation pit construction in cover cut area and open cut area, and improve the construction efficiency.

Cite this article

Guo Fei , Li Zhaoping , Han Xuegang , Cui Xiangyang , Song Jianping . Research on the Construction Scheme of Underground Transportation Hub Based on the Combined Method of Cover and Open Excavation[J]. Chinese Journal of Underground Space and Engineering, 2024 , 20(2) : 546 -555 . DOI: 10.20174/j.JUSE.2024.02.21

References

[1]缪宇宁. 上海虹桥综合交通枢纽地区地下空间规划[J]. 地下空间与工程学报, 2010, 6(2): 243-249.(Miao Yuning. Underground space planning of Shanghai Hongqiao integrated transportation hub region [J]. Chinese Journal of Underground Space and Engineering, 2010, 6(2): 243-249.(in Chinese))
[2]谢忻玥,胡昊,范益群. 地下综合交通枢纽设计研究[J]. 地下空间与工程学报, 2016, 12(5): 1157-1163.(Xie Xinyue,Hu Hao,Fan Yiqun. A study on the design of underground transportation hub [J]. Chinese Journal of Underground Space and Engineering, 2016, 12(5): 1157-1163.(in Chinese))
[3]贾坚,谢小林,张羽,等. 城市综合交通枢纽地下空间一体化建设技术[J]. 上海交通大学学报, 2012, 46(1): 7-12.(Jia Jian,Xie Xiaolin,Zhang Yu,et al. Techniques of the integration construction of underground space in comprehensive urban transportation hub[J]. Journal of Shanghai Jiaotong University, 2012, 46(1): 7-12 (in Chinese))
[4]翁其平. 无锡火车站综合交通枢纽超大面积基坑工程设计与实践[J]. 土木工程学报,2015,48(增2): 103-107.(Weng Qiping. Design and practice of the super-large deep excavation of the Wuxi Railway Station traffic hub[J]. China Civil Engineering Journal,2015,48(Supp.2): 103-107. (in Chinese))
[5]弓广辉,卢艳伟,陈振溢,等. 邻近地铁车站配套地下结构建造方案研究[J]. 铁道标准设计, 2018, 62(5): 99-103. (Gong Guanghui,Lu Yanwei,Chen Zhenyi,et al. Study on construction scheme for attached underground structures adjacent to subway station[J]. Railway Standard Design, 2018, 62(5): 99-103. (in Chinese))
[6]黄斌. 轨道交通、市政地道和过街通道的地下空间一体化设计施工[J]. 建筑结构, 2013, 43(增2): 84-87. (Huang Bin. Rail transportation, municipal tunnel and crossing tunnel underground space integrated design and construction[J]. Building Structure, 2013, 43(Supp.2): 84-87. (in Chinese))
[7]宋延涛. 盖挖逆作法深基坑施工关键技术研究[J]. 铁道建筑技术, 2019(4): 109-112.(Song Yantao. Construction technique study on cut-and-cover top-down excavation method for deep foundation pit[J]. Railway Construction Technology, 2019(4): 109-112. (in Chinese))
[8]张海涛,李兆平,冯超,等.京张高铁清河站地下交通枢纽分体建造工法研究[J]. 隧道建设(中英文), 2021,41(12):2163-2170. (Zhang Haitao, Li Zhaoping, Feng Chao, et al. Split construction method for underground traffic hub structure attached to Qinghe Station of Beijing-Zhangjiakou High-Speed Railway[J]. Tunnel Construction, 2021, 41(12):2163-2170. (in Chinese))
[9]宋林,李昌宁,范恒秀.紧邻既有线地铁车站深基坑施工开挖方案研究[J]. 现代隧道技术, 2016, 53(5): 154-160.(Song lin, Li Changning, Fan Hengxiu. Study on the excavation scheme for the deep foundation pit of a subway station approaching an existing railway[J]. Modern Tunnelling Technology 2016,53(5):154-160. (in Chinese))
[10]薛光桥.深基坑双排桩结构受力变形机理及其计算模型研究[J].铁道标准设计,2016,60(7):116-120.(Xue Guangqiao. Research on mechanism and computation model of deep foundation pit double-row pile structure[J].Railway Standard Design, 2016,60(7):116-120.. (in Chinese))
[11]沈雯,沈蓉,孙廉威. 超深基坑分区开挖对侧方地铁影响的实测分析[J]. 地下空间与工程学报, 2019, 15(增1): 354-360.(Shen Wen,Shen Rong,Sun Lianwei. Field monitoring and analysis on the influence of deep excavation on adjacent metro[J]. Chinese Journal of Underground Space and Engineering, 2019, 15(Supp.1): 354-360.(in Chinese))
[12]魏宁,姚爱军,李鹏,等. 超近距离基坑施工对交叠地铁的影响及响应[J]. 地下空间与工程学报, 2018, 14(4): 1056-1063.(Wei Ning, Yao Aijun, Li Peng, et al. Influence and response of construction of ultra-close foundation to overlapping metro[J]. Chinese Journal of Underground Space and Engineering, 2018, 14(4): 1056-1063.(in Chinese))
[13]丁乐.基坑开挖对邻近地铁车站安全影响的三维有限元分析—以西朗公交枢纽站为例[J].隧道建设,2015,35(4): 328-334.( Case study on 3D finite element analysis on influence of cutting of foundation pit on safety of existing adjacent metro station[J].Tunnel Construction,2015,35(4): 328-334. (in Chinese))
[14]Shi C H,Cao C Y,Lei M F,et al. Effects of lateral unloading on the mechanical and deformation performance of shield tunnel segment joints[J].Tunneling and Underground Space Technology, 2016, 51: 175-188.
[15]胡显鹏.地下4层盖挖逆作地铁车站设计要点研究[J].都市快轨交通, 2016, 29(6) : 82-86.(Hu Xianpeng. Key points of subway station design with 4-storey underground by covered top-down excavation method[J]. Urban Rapid Rail Transit, 2016, 29(6) : 82-86. (in Chinese))
[16]戚腾舞.地铁PBA车站钢管柱安装工艺与控制措施研究[J].铁道建筑技术,2018 (12):96-99.(Qi Tengwu. Research on installation process of steel pipe column for metro PBA station and its control measures[J].Railway Construction Technology,2018 (12):96-99.(in Chinese) )
[17]刘力,高辛财.“洞桩法”暗挖车站施工阶段钢管混凝土柱承载力计算[J].隧道建设(中英文),2019,39(7):1152-1157.(Liu Li, Gao Xincai. Bearing capacity calculation of concrete-filled steel tubular column during construction of metro station by PBA method[J]. Tunnel Construction,2019,39(7):1152-1157.(in Chinese)).