PDF(2493 KB)
Research on Pipe Misalignment Caused by Grouting behind the Wall of Shield Tunnel with Small Turning Radius
Yao Yuan
Chinese Journal of Underground Space and Engineering ›› 2026, Vol. 22 ›› Issue (S1) : 286-293.
PDF(2493 KB)
PDF(2493 KB)
Research on Pipe Misalignment Caused by Grouting behind the Wall of Shield Tunnel with Small Turning Radius
| {{custom_ref.label}} |
{{custom_citation.content}}
{{custom_citation.annotation}}
|
/
| 〈 |
|
〉 |