针对深埋富水地层隧道施工中传统疏排水工法在高水压、强突涌风险条件下适应性不足的问题,提出了一种基于泥水平衡顶管的立体排水技术,并依托王家寨隧道工程对其实施效果及关键技术问题进行了系统研究。通过在掌子面前方布设大直径泥水平衡顶管,并结合管内径向泄水孔构建立体排水网络,实现了承压水的集中引排与水力环境重构。工程实践表明,顶管排水系统运行后,掌子面水压由约0.35 MPa稳定降低至0.15~0.20 MPa,显著削弱了高压地下水致灾风险。针对强富水粉细砂地层中顶进阻力大的问题,采用触变泥浆减阻与振动减阻相结合的措施,施工统计结果显示,管-土动摩阻力较静摩阻力降低约26.5%,有效改善了停顿—再启动工况下的顶进稳定性。在此基础上,对比分析了不同顶推力计算方法在超高压富水地层中的适用性差异,指出仅基于结构控制的顶推力取值难以反映极端工况下的阻力上限,需结合承压水作用与摩阻累积效应,并通过系统级分段推进策略加以应对。研究成果可为类似深埋强富水地下空间工程的排水与施工风险控制提供参考。
[1] Chen P, Liu X, Deng Z, et al. Study on the pipe friction resistance in long-distance rock pipe jacking engineering[J]. Underground Space, 2023,9(2):173-185.
[2] Zhong Z, Zhu K, Tang J, et al. Intelligent Prediction of Cutting Depth and Parameter Optimization in Abrasive Waterjet Cutting[J]. Rock Mechanics and Rock Engineering, 2026,59(3):3793-3820.
[3] Zhu K, Zhong Z, Wang N, et al. Mechanical Properties and Nonlinear Energy Evolution of Holed Limestone Under Hydro-Mechanical Coupling[J]. Rock Mechanics and Rock Engineering, 2025, 58(1):807-826.
[4] Deng Z, Liang N, Liu X, et al. Analysis and application of friction calculation model for long-distance rock pipe jacking engineering[J]. Tunnelling and Underground Space Technology, 2021, 115:104063.
[5] 谢森林, 胡安峰, 肖志荣, 等. 渗漏病害加剧影响下隧道周围土体流变固结分析[J]. 岩石力学与工程学报, 2024, 43(10):2570-2580.
[6] 孙阳, 宋德威, 李耀东, 等. 矩形顶管考虑泥浆触变特性的顶推力计算[J]. 地下空间与工程学报, 2022, 18(4):1097-1103.
[7] 刘嘉淳, 李志华, 谈力昕, 等. 泥水平衡顶管技术在商周高速穿越工程中的应用[J]. 地质科技情报, 2016, 35(2):28-32.
[8] 张志伟, 李忠超, 梁荣柱, 等. 软土地层矩形顶管掘进引起地表隆沉变形分析[J]. 岩土力学, 2022, 43(增1):419-430.
[9] 夏洋洋, 方宏远, 张超, 等. 顶管施工对新型复合装配式支护工作井的力学响应分析[J]. 岩土力学, 2022, 43(10):2799-2808.
[10] 傅德明, 楼如岳. 泥水平衡顶管施工及参数研究[J]. 岩石力学与工程学报, 2003(增1):2493-2501.
[11] 张鹏, 谈力昕, 马保松. 考虑泥浆触变性和管土接触特性的顶管摩阻力公式[J]. 岩土工程学报, 2017, 39(11):2043-2049.
[12] 谢一鸣, 谢孔金, 王海洋, 等. 市政污水管道泥水平衡顶管施工技术[J]. 施工技术(中英文), 2023, 52(24):89-92.
[13] 杨恺. 复杂地质条件下顶管施工效率及影响因素研究[J]. 人民长江, 2019, 50(10):171-174.
[14] Ye Y, Peng L, Zhou Y, et al. Prediction of Friction Resistance for Slurry Pipe Jacking[J]. Applied Sciences, 2019, 10(1):10010207.
[15] Deng Z, Liu X, Zhou X, et al. Main engineering problems and countermeasures in ultra-long-distance rock pipe jacking project:Water pipeline case study in Chongqing[J]. Tunnelling and Underground Space Technology, 2022, 123:104420.
[16] Deng Z, Liu X, Zhou X, et al. Field monitoring of mechanical parameters of deep-buried jacketed-pipes in rock:Guanjingkou water control project[J]. Tunnelling and Underground Space Technology, 2022, 125:104531.
[17] 秦林, 郝欣, 汪林. 顶管技术在地下空间中小型管道施工中的应用[J]. 现代隧道技术, 2022, 59(增2):228-33.
[18] Ma X, Tang G, Cao M, et al. Slurry rheological effect on grouting in pipe jacking based on centrifuge model tests[J]. International Journal of Physical Modelling in Geotechnics, 2025, 25(4):209-218.
[19] Wen K, Zeng W, Shimada H, et al. Numerical and theoretical study on the jacking force prediction of slurry pipe jacking traversing frozen ground[J]. Tunnelling and Underground Space Technology, 2021, 115:104076.
[20] 王盟盟, 范磊, 孙英杰, 等. 适用于超长距离的硬岩顶管机关键技术研究及应用[J]. 隧道建设(中英文), 2025, 45(增1):351-360.
[21] Xu Y, Zhang Z, Zhang C, et al. Analysis of longitudinal deformation of existing rectangular pipe jacking tunnel caused by shield tunnel undercrossing[J]. Tunnelling and Underground Space Technology, 2025, 161:106532.
[22] Liu W, Zhang S, Chen W, et al. Analytical method for the vertical response of existing shield tunnel induced by above-crossing multiple parallel pipe jacking[J]. Tunnelling and Underground Space Technology, 2025, 165:106873.
[23] 龚廷民, 贾连辉, 谌文涛, 等. 适用于复合地层的硬岩泥水平衡顶管关键技术[J]. 隧道建设(中英文), 2020, 40(6):880-889.
[24] 孙庆, 冯文强, 王志云, 等. 大东湖核心区污水传输支隧工程顶管施工关键技术研究与应用[J]. 隧道建设(中英文), 2021, 41(7):1218-1224.
[25] 中国工程建设标准化协会. 给水排水工程顶管技术规程(CECS 246-2008)[S]. 北京:中国计划出版社, 2008.
[26] 中华人民共和国交通运输部. 公路隧道设计规范(JTG 3370.1-2018)[S]. 北京:人民交通出版社, 2018.
[27] 中华人民共和国住房和城乡建设部. 钢结构设计标准(GB 50017-2017)[S]. 北京:中国建筑工业出版社,2017.
[28] 曾建军, 赵东平, 王风, 等. 顶管隧道研究现状与发展趋势[J]. 现代隧道技术, 2024, 61(增1):1-16.
[29] 王乐, 贺建群, 范昌彬. 复杂条件下顶管注浆减阻技术研究与应用[J]. 现代隧道技术, 2018, 55(3):200-4.
[30] Ye Y, Peng L, Yang W, et al. Calculation of Friction Force for Slurry Pipe Jacking considering Soil-Slurry-Pipe Interaction[J]. Advances in Civil Engineering, 2020, 2020(1):6594306.
[31] 叶艺超, 彭立敏, 杨伟超, 等. 考虑泥浆触变性的顶管顶力计算方法[J]. 岩土工程学报, 2015, 37(9):1653-1659.
[32] Liu J, Cheng H, Cai H, et al. Design and Analysis of Grouting Pressure in Slurry Pipe Jacking Based on the Surrounding Soil Stability Mechanical Characteristics[J]. Geofluids, 2022, 2022:1-17.
[33] Wadood A, Mccabe B A, Sheil B B. Field monitoring and instrumentation in microtunnelling/pipe jacking:A review and future directions[J]. Underground Space, 2025, 22:225-240.
[34] Sterling R L. Developments and research directions in pipe jacking and microtunneling[J]. Underground Space, 2020, 5(1):1-19.
[35] 中华人民共和国交通运输部. 公路隧道设计细则(JTG/T D70-2010)[S]. 北京:人民交通出版社, 2010.
[36] 钟祖良, 杜传烨, 刘新荣, 等. 岩石顶管穿越深大断层破碎带摩阻力计算方法研究[J]. 岩土力学, 2025, 46(3):943-954.