软土地区由于“高含水、低承载及强冻胀”的特性常导致人工冻结法施工困难。依托天津地铁11号线某区间联络通道工程现场实测数据,采用ABAQUS构建含冰-水相变的非线性热-力耦合模型,研究土体温度、冻结壁厚度与主隧道变形的时程响应与变化规律。结果表明:黏质粉土地层中冻结开始约25 d后冻结壁初始交圈,约36 d后冻土平均温度降至-10 ℃,约38 d后冻结壁最薄处厚度达到2 m,基本满足开挖条件;积极冻结期间主隧道的拱顶位移呈倒“V”形变形,其净空收敛呈“W”形变形;冻结壁交圈后土体冻胀效应显著加剧,导致地表隆起并以联络通道轴线为中心近似呈正态分布,隆起峰值与冻结管布设密度正相关,冻胀引起的地表隆起范围约为联络通道覆土厚度的2.16倍。研究揭示了天津黏质粉土地层冻结过程中的土体-隧道耦合变形规律,可为类似地层的冻结法参数设计与施工控制提供参考。
Soft ground with high water content, low bearing capacity, and pronounced frost susceptibility presents considerable challenges to artificial ground freezing (AGF) construction. Using field monitoring data obtained from a cross-passage project along Tianjin Metro Line 11, a nonlinear thermo-mechanical coupled model considering ice-water phase transition was established in ABAQUS to examine the time-dependent evolution of soil temperature, frozen wall thickness, and main tunnel deformation. The results show that, in the clayey silt stratum, initial closure of the frozen wall occurred at approximately 25 d after the onset of freezing. The mean temperature of the frozen soil decreased to -10 ℃ after about 36 d, while the minimum thickness of the frozen wall reached 2 m at approximately 38 d, thereby basically meeting the excavation demand. During active freezing, the tunnel crown displacement exhibited an inverted V-shaped distribution, whereas the clearance convergence showed a W-shaped pattern. Once the frozen wall was fully closed, the frost-heave effect intensified markedly, causing ground surface uplift that was approximately normally distributed about the cross-passage axis. The peak surface uplift was positively correlated with the spacing density of the freezing pipes, and the influence zone of frost-heave-induced uplift extended to approximately 2.16 times the overburden thickness of the cross passage. The study elucidates the coupled soil-tunnel deformation behavior during freezing in Tianjin clayey silt ground and provides a reference for AGF parameter design and construction control in similar ground conditions.
[1] 岳丰田,张水宾,仇培云,等.地铁联络通道冻结加固技术研究[J].地下空间与工程学报,2006.2(增2):1341-1345.
[2] 李逸涛,狄宏规,余鲸,等.车致振动下偏心联络通道-主隧道体系响应研究[J].地下空间与工程学报,2024,20(增2):865-873, 891.
[3] 杨哲,任连伟,邓岳保,等.软土机械法联络通道衬砌受力与地表变形分析[J].地下空间与工程学报,2024,20(增2):971-980.
[4] 闫伟,宋彦杰,程雪松,等.盾构法联络通道施工对始发端隧道的影响分析[J].地下空间与工程学报,2024,20(增1):236-246.
[5] 邱恩喜,潘宏宇,何巧玲,等.冻融条件下冰碛土力学特性试验及模型研究[J]. 工程地质学报, 2024, 32(3):772-784.
[6] 李长清,叶万军,胡双平,等.高富水卵砾石地层热物理参数试验研究[J]. 工程地质学报, 2020, 28(3):510-519.
[7] 唐益群,赵文强,周洁.封闭系统单向冻结淤泥质黏土水分迁移特性研究[J]. 工程地质学报, 2020, 28(5):935-941.
[8] Yan Q X, Xu Y J, Yang W B, et al. 2017. Nonlinear transient analysis of temperature fields in an AGF project used for a cross-passage tunnel in the Suzhou metro[J]. KSCE Journal of Civil Engineering, 22(4):1473-1483.
[9] 徐亚峰,童俊,陈玮,等.超长倾斜联络通道冻结施工全过程有限元分析[J]. 地下空间与工程学报, 2024, 20(4):1317-1326.
[10] 王晖,李大勇,李健,等.地铁联络通道冻结法施工三维数值模拟分析[J]. 地下空间与工程学报, 2011, 7(增2):1589-1593.
[11] 胡小荣,饶志强,汪日堂.南昌地铁联络通道冻结法模拟[J]. 地下空间与工程学报, 2019, 15(增1):286-292, 399.
[12] 文彦鑫,伍旺,郭治岳,等.富水砂卵石地层地铁联络横通道人工冻结数值分析[J]. 土木与环境工程学报(中英文), 2022, 44(6):63-74.
[13] 陈凯文,戴自航,张浩,等.厦门滨海区某地铁联络通道冻结法施工监测与温度场分析[J].工程地质学报,2023,31(5):1748-1756.
[14] 张晋勋,杨吴,单仁亮,等.冻结饱水砂卵石三轴压缩强度试验研究[J]. 岩土力学, 2018, 39(11):3993-4000.
[15] 闫澍旺,李康,邱长林.天津滨海新区人工冻结粉质黏土强度特性试验研究[J]. 科学技术与工程, 2017, 17(3):282-287.
[16] 孙立强,任宇晓,闫澍旺,等.人工冻土冻结过程中热-力耦合的数值模拟方法研究[J]. 岩土工程学报, 2015, 37(增2):137-142.
[17] Peck R B. Deep excavations and tunnelling in soft ground[A]//Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering[C]. Mexico City, 1969:225-229.
[18] 黄建,贾德华.北京地铁联络通道三维冻结温度场数值模拟[J]. 铁道建筑, 2021, 61(1):73-77.
[19] 张志强,何川.用冻结法修建地铁联络通道施工力学研究[J]. 岩石力学与工程学报, 2005, 24(18):3211-3217.