设计、施工、监测

大直径盾构施工围岩附加应力分析与计算

  • 李继超 ,
  • 郭东 ,
  • 栾帅 ,
  • 邱运军 ,
  • 李永裕
展开
  • 1.中国建设基础设施有限公司,北京 100161;
    2.中建南方投资有限公司,广东 深圳 518000;
    3.中国建筑一局(集团)有限公司,北京 100161
李继超 (1975—),男,郑州人,正高级工程师,主要从事轨道交通、房屋建筑等方面的研究工作。E-mail:670418239@qq.com
郭东 (1993—),男,山西原平人,博士,工程师,主要从事轨道交通、地下工程等领域的研究工作。E-mail:13713510895@163.com

收稿日期: 2025-12-08

  网络出版日期: 2026-09-29

基金资助

中建基础课题(CSCIC-2022-KT-(01))

Analysis and Calculation of the Stress Variation on Surrounding Rock during Large Diameter Shield Construction

  • Li Jichao ,
  • Guo Dong ,
  • Luan Shuai ,
  • Qiu Yunjun ,
  • Li Yongyu
Expand
  • 1. China Construction Infrastructure Co., Ltd., Beijing 100161, P. R. China;
    2. China Construction South Investment Co., Ltd., Shenzhen, Guangdong 518000, P. R. China;
    3. China Construction First Group Co., Ltd., Beijing 100161, P. R. China

Received date: 2025-12-08

  Online published: 2026-09-29

摘要

大直径盾构施工技术为城市轨道交通建设的首选工法,但施工中面临着大断面开挖、高施工荷载、地层扰动明显等严峻挑战。目前关于大直径盾构施工先掘进、后注浆导致的围岩应力动态演化规律及受力机理的研究仍存在明显不足。提出了一种盾构掘进隧道围岩应力实时监测方法,对大直径土压平衡盾构隧道施工过程中围岩应力变化进行监测与分析。基于测试结果分析盾构施工过程中围岩附加应力的变化规律,并对盾构掘进围岩附加应力的计算方法进行讨论。结果表明:盾构施工过程中,隧道围岩总应力变化分2个阶段,一阶段为盾构掘进刀盘到达前由盾构掘进施加在掌子面的接触压力所导致;二阶段为刀盘穿越监测位置后,监测位置管片拼装后同步注浆压力所导致,在盾构穿越后仍会存在一个残余附加应力。基于盾构掘进掌子面接触压力得出了一阶段围岩附加应力计算方法,基于同步注浆压力得出了二阶段围岩附加应力计算方法。此外,得出了盾构施工导致的不同间距下围岩附加总应力最大值与围岩残余附加应力计算方法。并基于其他区域盾构掘进对上述围岩附加应力变化规律与计算方法进行了验证。结果表明:本文提出的盾构施工引起的围岩附加应力计算方法精度满足9米级土压盾构在岩石完整性较好的硬岩地层中施工时的工程需求;大直径盾构岩层围岩应力影响范围约0.5倍盾构直径,应重点控制掌子面接触压力与同步注浆压力,以降低围岩附加应力与残余变形。

本文引用格式

李继超 , 郭东 , 栾帅 , 邱运军 , 李永裕 . 大直径盾构施工围岩附加应力分析与计算[J]. 地下空间与工程学报, 2026 , 22(S1) : 222 -229 . DOI: 10.20174/j.JUSE.2026.S1.25

Abstract

Large-diameter shield technology has become the preferred method for construction of urban rail transit. However, large-diameter shield tunnel construction faces severe challenges, including large-section excavation, high construction loads, and significant ground disturbance. Currently, research on the dynamic evolution and mechanism of surrounding rock stress induced by excavation and subsequent grouting in large-diameter shield tunneling remains insufficient. This paper proposes a real-time monitoring method for surrounding rock stress during shield tunneling, enabling the monitoring and analysis of stress variations in large-diameter earth pressure balance (EPB) shield tunnels during construction. Based on monitoring results, the paper analyzes the evolution of additional stress during shield tunneling and discusses calculation methods for additional stress induced by shield excavation. The total stress changes in surrounding rock during shield tunneling occur in two stages. Caused by contact pressure applied by the shield cutterhead to the tunnel face before its arrival at the monitoring location and induced by synchronous grouting pressure after segment installation at the monitoring location following cutterhead passage. A residual additional stress persists even after the shield passes through the monitoring zone. The paper derives calculation methods for additional stress in Stage I based on cutterhead contact pressure and for Stage II based on synchronous grouting pressure. Furthermore, it proposes calculation methods for the maximum total additional stress and residual additional stress in different spacing due to shield tunneling. The above calculation method was verified by shield tunneling in other sections. Results show that the proposed method meets engineering requirements for 9m-class EPB shields in sound hard rock. The stress influence zone is about 0.5 shield diameter. Face contact pressure and synchronous grouting pressure should be strictly controlled to reduce additional stress and residual deformation.

参考文献

[1] 加瑞,李青茁,杨岗,等. 盾构隧道渗漏对地表沉降和管片受力影响研究[J].地下空间与工程学报,2023,19(增1):423-435.
[2] 黄辉,潘泓,陈乔松,等. 高富水复合砂层盾构隧道渗透破坏原因分析[J]. 地下空间与工程学报,2024,20(1):302-310.
[3] Han W W, Wang X G, Han L J. Study on the optimum grouting materials and their performance in the TBM tunnel collapse reinforcement project[J]. IOP Conference Series:Earth and Environmental Science, 2020, 570(5):52-65.
[4] Hong K R. Typical underwater tunnels in the mainland of China and related tunneling technologies[J]. Engineering, 2017, 3(6):871-879.
[5] 方焘,梁连,颜建伟. 不同埋深下盾构隧道施工引起的地层变形试验[J].长江科学院院报,2023,40(3):85-92.
[6] Hamderi M. Footing settlement formula based on multi-variable regression analyses[J]. Geomechanics and Engineering, 2019, 17(1):11-18.
[7] Toshi N, Shinichiro I, Toshiyuki H, et al. Shield tunnel construction in centrifuge[J]. Journal of Geotechnical and Geoenvironmental Engineering, 1999, 125(4):132-142.
[8] 赵玉勃,张忠苗. 盾构法隧道推进引起周围土体的附加应力分析[J]. 岩土工程学报,2010,32(9):1386-1390.
[9] 孙统立,张庆贺,韦良文,等. 双圆盾构掘进施工扰动土体附加应力分析[J].岩土力学, 2008, 29(8):2246-2251.
[10] 储昭飞,刘保国. 盾构法施工深埋斜井的围岩应力变形分析[J]. 北京交通大学学报, 2016, 40 (6):1-6.
[11] 陈昂,张雪辉,白云,等. 类矩形土压平衡盾构施工附加应力分析[J]. 岩石力学与工程学报, 2017, 36(7):1813-1819.
[12] 武崇福,魏超,乔菲菲. 既有上部建筑荷载下盾构施工引起土体附加应力分析[J].岩石力学与工程学报, 2018, 37(7):14.
[13] 孙洋,荣耀,习小华,等. 近接施工先行隧道盾构管片三维附加应力监测分析[J]. 公路, 2016, 61(4):239-247.
[14] Liu N, Wen Z Y, You G M, et al. Study on the calculation of the surrounding rock stress on shield tunnels in rock strata[J]. Geotechnical and Geological Engineering, 2023, 41(8):4383-4393.
[15] 黄宏伟,胡昕.顶管施工力学效应的数值模拟分析[J].岩石力学与工程学报, 2003, 22(3):400-406.
[16] 周中,胡江锋,刘撞撞,等. 盾构隧道壁后注浆浆液时变性对围岩应力与变形的影响机理[J].中国铁道科学,2022,43(3):86-93.
[17] Liu N, Wen Z, You S, et al. Study on the calculation of the surrounding rock stress on shield tunnels in rock strata[J]. Geotechnical and geological engineering, 2023, 41(8):4383-4393.
[18] 李志明,廖少明,戴志仁. 盾构同步注浆填充机理及压力分布研究[J]. 岩土工程学报, 2010, 32(11):1752-1757.
[19] 王洪新. 土压平衡盾构刀盘挤土效应及刀盘开口率对盾构正面接触压力影响[J].土木工程学报, 2009, 42(7):113-118.
[20] 叶飞,苟长飞,毛家骅,等. 黏土地层盾构隧道临界注浆压力计算及影响因素分析[J].岩土力学,2015,36(4):937-945.
文章导航

/

〈 〉