[1] 刘建友,赵勇,过燕芳.软弱围岩隧道安全快速施工技术研究[J].隧道建设,2011,31(增1):381-387.(Liu Jianyong, Zhao Yong, Guo Yanfang.Study on safe and rapid construction technology for weak surrounding rock tunnels[J].Tunnel Construction, 2011,31(Supp.1):381-387 (in Chinese))
[2] 尤匡飞.中天山隧道快速施工综合技术研究[D].成都:西南交通大学,2013.(You Kuangfei.Zhong tian shan tunnel rapid construction of comprehensive technical research[D].Chengdu: Southwest Jiaotong University Master Degree Thesis, 2013.(in Chinese))
[3] 陈科志.软岩隧道快速施工影响因素研究[D].北京:北京交通大学,2012.(Chen Kezhi.Study of tunnel rapid construction influencing factors in soft rock[D].Beijing: Beijing Jiaotong University, 2012.(in Chinese))
[4] 阳长江.浅埋软弱围岩大跨度扁平隧道快速施工研究[D].重庆:重庆交通大学,2012.(Yang Changjiang.Study on the rapid construction of shallow buried weak rocks and large-span flat tunnel[D].Chongqing:Chongqing Jiaotong University, 2012.(in Chinese))
[5] 周佳媚,程毅,邹仕伟,等.断层错动及地震作用下隧道力学特性研究[J].铁道标准设计,2019,63(11):138-144.(Zhou Jiamei, Cheng Yi, Zou Shiwei, et al.Research on mechanical characteristics of tunnel under fault movement and seismic[J].Railway Standard Design,,2019,63(11):138-144.(in Chinese))
[6] 崔光耀,王明年,于丽,等.汶川地震断层破碎带段隧道结构震害分析及震害机理研究[J].土木工程学报,2013,46(11):122-127.(Cui Guangyao, Wang Mingnian, Yu Li, et al.Study on the characteristics and mechanism of seismic damage for tunnel structures on fault rupture zone in Wenchuan seismic disastrous area[J].China Civil Engineering Journal, 2013,46(11):122-127.(in Chinese))
[7] 舒宗运,彭丁茂,刘骏,等.隧道穿越溶洞及断层突水机理与防控对策研究[J].地下空间与工程学报, 2022,18(增2):993-1000.(Shu Zongyun, Peng Dingmao, Liu Jun, et al.Study on water inrush mechanism and prevention and treatment measures of tunnel crossing karst area and fault zone[J].Chinese Journal of Underground Space and Engineering, 2022,18(Supp.2):993-1000.(in Chinese))
[8] 卢庆钊.基于AHP-Fuzzy的隧道穿富水断层破碎带突水涌泥评估[J].地下空间与工程学报,2021,17(增1):439-448, 462.(Lu Qingzhao.Risk assessment of water and mud inrush in tunnel crossing water-rich fault fracture zone based on AHP-fuzzy[J].Chinese Journal of Underground Space and Engineering, 2021,17(Supp.1):439-448, 462.(in Chinese))
[9] 薛翊国,孔凡猛,杨为民,等.川藏铁路沿线主要不良地质条件与工程地质问题[J].岩石力学与工程学报,2020,39(3):445-468.(Xue Yiguo, Kong fanmeng, Yang Weimin, et al.Main unfavorable geological conditions and engineering geological along Sichuan-Tibet railway[J].China Journal of Rock Mechanics and Engineering, 2020,39(3):445-468.(in Chinese))
[10] 李利平,李术才,赵勇,等.超大断面隧道软弱破碎围岩空间变形机制与荷载释放演化规律[J].岩石力学与工程学报,2012,31(10):2109-2118.(Li Liping, Li Shucai, Zhao Yong, et al.Spatial deformation mechanism and load release evolution law of surrounding rock during construction of super-large section tunnel with soft broken surrounding rock masses.[J].China Journal of Rock Mechanics and Engineering, 2012,31(10):2109-2118.(in Chinese))
[11] 雷军,张金柱,林传年.乌鞘岭特长隧道复杂地质条件下断层带应力及变形现场监测分析[J].岩土力学,2008(5):1367-1371.(Lei Jun, Zhang Jinzhu, Lin Chuannian, et al.Analysis of stress and deformation site-monitoring in fault zone of Wushaoling tunnel under complex geological conditions[J].Rock and Soil Mechanics, 2008(5):1367-1371.(in Chinese))
[12] 邵润萌.断层错动作用下隧道工程损伤及岩土失效扩展机理研究[D].北京:北京交通大学,2011.(Shao runmeng.Study on the mechanism of tunnel damage and geotechnical failure propagation due to fault rupture[D].Beijing:Beijing Jiaotong University, 2011.(in Chinese))
[13] 李玉生,翁贤杰,王人杰,等.隧道穿越断层破碎带突水突泥机理模拟试验研究[J].公路交通科技,2020,37(12):89-99.(Li Yusheng, Wong Xianjie, Wang Renjie, et al.Experimental study on simulating mechanism of water and mud inrush in tunnel crossing fault fracture zone[J].Journal of Highway and Transportation Research and Development, 2020, 37(12): 89-99.(in Chinese))
[14] 张向阳,任尚磊,许林峰.断层错动作用下隧道衬砌围岩破坏机理研究[J].地下空间与工程学报,2021,17(1):290-299.(Zhang Xiangyang, Ren Shanglei, Xu Linfeng, et al.Study on coupled failure mechanism of tunnel structural surrounding rock under fault motion[J].Chinese Journal of Underground Space and Engineering, 2021,17(1):290-299.(in Chinese))
[15] 唐锐,李世琦,王俊,等.富水断裂带隧道涌水突泥灾害机制及处治技术研究[J].地下空间与工程学报, 2021,17(4): 1264-1272, 1290.(Tang Rui, Li Shiqi, Wang Jun, et al.Research on mechanism and treatment technology of water inrush and mud inrush in tunnel of water-rich fault zone[J].Chinese Journal of Underground Space and Engineering, 2021,17(4): 1264-1272, 1290.(in Chinese))
[16] 朱合华,黄锋,徐前卫.变埋深下软弱破碎隧道围岩渐进性破坏试验与数值模拟[J].岩石力学与工程学报,2010,29(6):1113-1122.(Zhu Hehua, Huang Feng, Xu Qianwei.Model test and numerical simulation for progressive failure of weak and fractured tunnel surrounding rock under different overburden depths[J].China Journal of Rock Mechanics and Engineering, 2010,29(6):1113-1122.(in Chinese))
[17] 刘学增,郭彪,李学锋,等.变形缝对跨断层隧道抗错断影响的模型试验研究[J].岩石力学与工程学报,2015,34(增2):3837-3843.(Liu Xuezeng, Guo Biao, Li Xuefeng.Model experiment study on effect of deformation joints on road tunnel resisting destruction by thrust fault stick-slip dislocation[J].China Journal of Rock Mechanics and Engineering, 2015,34(Supp.2):3837-3843.(in Chinese))
[18] Zhong Z L, Wang Z, Zhao M, et al.Structural damage assessment of mountain tunnels in fault fracture zone subjected to multiple strike-slip fault movement[J].Tunnelling and Underground Space Technology, 2020, 104: 103527.
[19] Liu X, Zhang C, Xiao H, et al.Deformation and failure characteristics of a deeply buried tunnel subjected to creep slip fault movement: based on the engineering conditions of Yunnan water intake project[J].Bulletin of Engineering Geology and the Environment, 2022, 81(8):1-16.
[20] 何满潮,景海河,孙晓明.软岩工程力学[M].北京:科学出版社,2002.(He Manchao, Jing Haihe, Sun Xiaoming.Applied mechanics of soft rock[M].Beijing: Science Press, 2002.(in Chinese))
[21] 张博.昌宁隧道软岩变形机理及NPR锚索开挖补偿支护技术研究[D].北京:中国矿业大学(北京),2022.(Zhang Bo.Study on soft rock deformation mechanism and NPR anchor cable prestressed compensation support technology of Changning tunnel[D].Beijing: China University of Mining & Technology, Beijing, 2022.(in Chinese))