Comparison and Selection Research on the Excavation Methods for Large-Section Underground Subway Stations

  • Lu Jinbiao ,
  • Xu Hailong ,
  • Li Yandong ,
  • Zhang Haiquan ,
  • Zhang Yongfeng
Expand
  • 1. PowerChina Construction Railway Investment Group Co., Ltd., Beijing 100000, P. R. China;
    2. PowerChina Construction Railway Investment Group Chongqing Co., Ltd., Chongqing 401100, P. R. China

Received date: 2025-05-28

  Online published: 2025-09-03

摘要

随着地铁车站在城市中的修建工期越来越紧张,一种车站修建新工艺“先隧后站”法应运而生且愈加成熟,其适配的开挖方法是“先隧后站”法中关键的一环。以重庆市4号线某暗挖地铁车站工程为依托,采用有限元软件FLAC3D对三种开挖方法(双侧壁导坑法、CD法和三台阶七步开挖法)进行数值模拟,研究得出了三种开挖方法下地层的沉降规律及车站支护结构、盾构临时管片衬砌与开挖之间的应力应变响应规律。结果表明:地层沉降随着埋深的增加而增大,其中双侧壁导坑法产生的沉降最小,三台阶七步法产生的沉降最大;三种开挖方法下锚杆及二次衬砌的应力分布规律几乎一致,其中双侧壁导坑法的锚杆轴力高出另外两种开挖法均约30%,而三台阶七步法的二次衬砌受力特征优于其他开挖法;对比盾构临时管片衬砌的应力应变分布规律,双侧壁导坑法明显优于CD法和三台阶七步法。

本文引用格式

路锦彪 , 徐海龙 , 厉彦栋 , 张海泉 , 张勇峰 . 大断面地铁暗挖车站开挖方法比选研究[J]. 地下空间与工程学报, 2025 , 21(S1) : 403 -409 . DOI: 10.20174/j.JUSE.2025.S1.47

Abstract

As the construction conditions of metro stations in cities become more and more complex, a new station construction technology “tunnel before station” method emerged and became more mature, and the appropriate excavation method is a key part of the “tunnel before station” method. Based on an underground subway station project of Line 4 in Chongqing City, this paper uses finite element software FLAC3D to conduct numerical simulation of three excavation methods (double-sidewall diversion method, CD method and three-step seven-step excavation method). The settlement law of the stratum under three excavation methods and the stress-strain response law between station supporting structure, shield temporary segment lining and excavation are studied. The results show that: The formation settlement increases with the increase of buried depth, in which the two-sidewall diversion method produces the smallest settlement, and the three-step seven-step method produces the largest settlement. Under the three excavation methods, the stress distribution of the bolt and the secondary lining is almost the same, in which the axial force of the double-wall driving method is about 30% higher than that of the other two excavation methods, while the stress characteristics of the secondary lining with the three-step and seven-step method are superior to the other excavation methods. Compared with the stress and strain distribution of shield temporary segment lining, the double-sidewall heading method is obviously superior to CD method and three-step seven-step method.

参考文献

[1] 李聪,廖正根,马加志.“先隧后井”法施工管片环缝防突涌处理技术[J]. 现代隧道技术,2021,58(增2):154-159.
[2] 杨春山.盾构隧道先隧后井施工对隧道变形的影响及对策研究[D]. 广州:华南理工大学,2015.
[3] Furukawa Y, Kitawaki T, Nishio M. Plan for executing a four-centered circular muddy water injection type shield tunneling method in Roppongi Station on the Metropolitan Subway No.12[J]. Kensetsu No Kikaika, 1997.
[4] Zertsalov M G, Kazachenko S A, Konyukhov D S. Investigation of foundation pit excavation influence on adjacent building[J]. Vestnik Mgsu,2014,104(6):57-62.
[5] 许世伟.盾构扩挖修建地铁车站施工方案研究[D]. 北京:北京交通大学,2007.
[6] 黄明利,申巧凤,申荣杰.单洞双线盾构隧道扩挖地铁车站方案研究[J]. 现代隧道技术,2017(6):15-23.
[7] 晏启祥, 刘罡, 李彬,等. 基于盾构扩挖法的地铁联络线施工力学分析[J]. 城市轨道交通研究,2014(7):93-98.
[8] 林刚,何川.盾构隧道基础上修建三连拱地铁车站结构参数研究[J]. 铁道学报,2003(6):93-98
[9] 李爱东,邓永忠.地铁车站小盾构先行大盾构扩挖技术研究应用[J]. 现代城市轨道交通,2021(增1):31-35.
[10] 上经卫,王琳凯,赵兴,等.“先隧后站”三台阶与两台阶开挖数值模拟对比分析研究[J]. 新型工业化,2022,12 (11) :117-122.
文章导航

/