针对浅埋超大跨小净距地铁车站穿越砂岩泥岩互层倾斜地层时围岩变形特征、施工方法及工序安排无经验可依的难题,以重庆轨道27号线磁器口车站工程为依托,探讨了不同地层倾角条件下开挖顺序和方法对车站围岩稳定性的影响,提出了浅埋超大跨小净距地铁车站穿越砂泥岩互层地层围岩优选施工方法。结果表明:在砂泥岩倾斜互层地层中,地层倾角40°为施工顺序的临界阈值,当地层倾角小于40°时,应当先开挖穿越倾斜地层侧洞室;当倾角大于40°时,先开挖远离倾斜地层侧洞室能显著降低围岩变形沉降,双侧壁导坑法作为优选工法较CRD法能显著降低围岩变形且优化支护结构受力,在该工程条件下具有良好适用性。
Focusing the lack of experience regarding surrounding rock deformation characteristics, construction methods and process arrangement for the shallow buried super-large span small clear distance subway station crossing sandstone mudstone interbedded inclined stratum when theof alternating sandstone and mudstone, this study takes the Ciqikou Station project on Chongqing Rail Line 27 as a case study, the different stratum inclination conditions under the influence of the excavation sequence and method of the stability of the station surrounding rock are explored. The preferred construction method of the shallow buried super-large span small clearance subway station crossing sandstone mudstone interbedded stratum is proposed. The results show that: In sandstone inclined interbedded strata, the inclination angle of 40° is the critical threshold of construction sequence, when the inclination angle of the strata is less than 40°, the side chamber passing through the inclined strata should be excavated first; When the inclination angle is more than 40°, excavating the side chamber away from the inclined strata can significantly reduce the deformation of the surrounding rock and settlement, among which, the double sidewall guide pit method as the preferred method can significantly reduce the deformation of the surrounding rock compared to the CRD method, and the CRD method can also significantly reduce the deformation of the surrounding rock. Optimizing the support structure force, which has good applicability under the project conditions.
[1] Song S G, Li S C, Li L P, et al.Model test study on vibration blasting of large cross-section tunnel with small clearance in horizontal stratified surrounding rock[J]. Tunnelling and Underground Space Technology, 2019,92:103013.
[2] Zhou Z L, Zhao J P, Tan Z S, et al. Mechanical responses in the construction process of super-large cross-section tunnel: A case study of Gongbei tunnel[J]. Tunnelling and Underground Space Technology, 2021,115: 104044.
[3] Yang X L, Jin Q Y, Ma J Q. Pressure from surrounding rock of three shallow tunnels with large section and small spacing[J]. Journal of Central South University,2012,19(8):2380-2385.
[4] 万涛,林刚,习淑娟.超小净距地铁三洞隧道群施工动态数值模拟[J]. 铁道工程学报,2016,33(12):93-98.
[5] 孙博涛,陈家征,李忠,等.浅埋双侧偏压小净距隧道围岩压力变化规律研究[J]. 粉煤灰综合利用,2024,38(5):50-58.
[6] 姚宇,李威,严晟,等.基于数值模拟的浅埋偏压小净距隧道施工顺序影响研究[J]. 河北工程大学学报(自然科学版),2024,41(4):73-81.
[7] 樊祥森.高地应力层状软岩小净距隧道施工力学行为及影响分区研究[D]. 石家庄:石家庄铁道大学,2024.
[8] Wang C,Su Z M. Feasibility Study on Step Method Excavation of Tunnels with Large Cross Section and Small Interval[J]. Procedia Environmental Sciences,2012,12:550-554.
[9] Li J K, Wang Y B. The Surface Deformation Law with Engineering Mechanics Caused by Construction of Tunnels with Large Section and Small Interval[A]//3rd International Conference on Material Science, Environment Science and Computer Science[C]. 2014, 440-443.
[10] 夏梦然.城市浅埋小净距隧道开挖诱发地表沉降及控制方法研究[D]. 济南:山东大学,2021.
[11] 晏启祥,何川,姚勇.软岩隧道施工特性及其动态力学行为研究[J]. 岩石力学与工程学报,2006(3):572-577.
[12] 晏启祥,何川,姚勇,等.软岩小净距隧道施工力学效应研究[J]. 地下空间与工程学报,2005(5):693-697.
[13] 周云.浅埋偏压小净距隧道开挖力学效应及不对称支护研究[D]. 重庆:重庆大学,2014.
[14] 蒋庆,孙克国,周慧超,等.超大断面小净距隧道方案优化研究[J]. 水利水电技术,2020,51(1):32-38.
[15] 苏鹏.大跨度小净距特长隧道施工工法研究[J]. 北方交通,2018(12):79-82.
[16] 汪华坡.超大断面小净距隧道围岩稳定性特征及施工控制措施研究[D]. 长沙:中南大学,2022.