设计、施工、监测

乌东德水电站地下洞室群创新施工方法与技术

  • 杨宗立 ,
  • 丁鹏 ,
  • 安瑞楠 ,
  • 简崇林 ,
  • 彭波
展开
  • 1.中国长江三峡集团公司,武汉 430010;
    2.中建一局集团华南建设有限公司,广东 深圳 518000;
    3.清华大学 水利水电工程系,北京 100084;
    4.火箭军研究院,北京 100011
杨宗立(1963—),男,湖北荆门人,正高级工程师,主要从事水利水电工程建设管理工作。E-mail:yang_zongli@ctg.com.cn
丁鹏(1986—),男,河南南阳人,博士,高级工程师,主要从事岩土与地下工程研究工作。E-mail:dingpeng20@tsinghua.org.cn

收稿日期: 2024-04-24

  网络出版日期: 2025-01-03

基金资助

中国三峡集团科研项目(WDD/0578, WDD/0490);中国水利水电第十一工程局有限公司资助项目(SHC-JNHPP-JSFW-01-18012022, SH-KHL-SUB-2021003)

Innovative Construction Method and Technology for Underground Caverns of Wudongde Hydropower Station

  • Yang Zongli ,
  • Ding Peng ,
  • An Ruinan ,
  • Jian Chonglin ,
  • Peng Bo
Expand
  • 1. China Three Gorges Corporation, Wuhan 430010, P. R. China;
    2. China Construction First Bureau Group South China Construction Co., Ltd., Shenzhen, Guangdong 518000, P. R. China;
    3. Department of Hydraulic Engineering, Tsinghua University, Beijing 100084;
    4. Rocket Force Academy, Beijing 100011, P. R. China

Received date: 2024-04-24

  Online published: 2025-01-03

摘要

大型水电工程中巨型地下洞室群的开挖、支护施工是技术难点,根据现场实际地质条件和工作环境对地下厂房的开挖及支护工法进行改进、对施工机械进行改良,是保证地下洞室群安全、优质、高效、绿色施工的重要保障。本文针对乌东德水电站大型地下洞室群施工过程中关键工法和技术难题,开展创新研发和攻关,包括:大跨度高边墙开挖施工、超大断面调压室开挖施工、小直径溜渣井式竖井开挖、不良地质段超大断面洞室支护、拔管法接触灌浆施工、洞内压力钢管拼装、多孔深竖井混凝土滑模施工、大型出线竖井施工等。从工艺类型、精细开挖、支护和装备革新技术等方面进行关键创新施工方法和技术总结,研究成果可供同类工程建设参考。

本文引用格式

杨宗立 , 丁鹏 , 安瑞楠 , 简崇林 , 彭波 . 乌东德水电站地下洞室群创新施工方法与技术[J]. 地下空间与工程学报, 2024 , 20(6) : 2045 -2053 . DOI: 10.20174/j.JUSE.2024.06.30

Abstract

The excavation and support construction of giant underground caverns in large-scale hydropower projects is a key route and a concentrated area of technical difficulties in engineering construction. Improving the excavation and support methods and construction machinery of underground power plants based on the actual geological conditions and working environment on site is an important guarantee for ensuring the safety, quality, efficiency, and green construction of underground caverns. This paper carried out innovative research, development and tackling of key construction methods and technical problems in the construction process of large underground caverns of Wudongde Hydropower Station, which included the excavation and construction of large-span high sidewall, excavation and construction of super large section surge chamber, excavation of small diameter slag chute shaft, support of super large section caverns in unfavorable geological sections, pipe pulling contact grouting construction, penstock assembly in the tunnel, concrete slip form construction of porous deep shaft and large outlet shaft construction, etc. Common key innovative construction methods and technologies from aspects such as process type, fine excavation, support, and equipment innovation technology were summarized. The research results could provide the reference for similar engineering construction.

参考文献

[1] Fan Q X, Deng Z Y, Lin P,et al. Coordinated deformation control technologies of the high sidewall-bottom transfixion zone of large underground hydro-powerhouses[J]. Journal of Zhejiang University-Sciench A, 2022, 23(7): 543-563.
[2] 樊启祥, 林鹏, 魏鹏程, 等. 智能建造闭环控制理论[J]. 清华大学学报(自然科学版), 2021, 61(7): 660-670. (Fan Qixiang, Lin Peng, Wei Pengcheng, et al. Closed gloop control theory of intelligent construction[J]. Journal of Tsinghua University (Science and Technology Edition), 2021, 61(7): 660-670. (in Chinese))
[3] Zhang J C, Xu W Y, Wang H L, et al. Testing and modeling of the mechanical behavior of dolomite in the Wudongde Hydropower Plant[J]. Geomechanics and Geoengineering, 2016, 11(4): 270-280.
[4] Wang G J, Xie M W, Chai X Q, et al. D-InSAR-based landslide location and monitoring at Wudongde Hydropower Reservoir in China[J]. Environmental Earth Sciences, 2013, 69: 2763-2777.
[5] 李昂, 戴峰, 徐奴文, 等. 乌东德水电站右岸地下厂房开挖围岩破坏模式及形成机制研究[J]. 岩石力学与工程学报, 2017, 36(4): 781-793. (Li Ang, Dai Feng, Xu Nuwen, et al. Failure mechanism and mode of surrounding rock of underground powerhouse at the right bank of Wudongde Hydropower Station subjected to excavation[J]. Chinese Journal of Rock Mechanics and Engineering, 2017, 36(4): 781-793. (in Chinese))
[6] Peng H Y, Lin P, Yang N, et al. Real time thermal field analysis on Wudongde super high arch dam during construction[J]. Global Energy Interconnection, 2019, 2(3): 264-269.
[7] 苏国韶, 冯夏庭, 江权, 等. 高地应力下大型地下洞室群开挖顺序与支护参数组合优化的智能方法[J]. 岩石力学与工程学报, 2007, 26(增1): 2800-2808. (Su Guozhao, Feng Xiating, Jia Quan, et al. Intelligent method of combinatorial optimization of excavation sequence and support parameters for large underground caverns under condition of high geostress[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(Supp.1): 2800-2808. (in Chinese))
[8] 李俊, 魏宝龙, 焦凯, 等. 大型地下洞室群开挖支护施工技术研究与实践——以杨房沟水电站为例[J]. 人民长江, 2018, 49(24): 76-82. (Li Jun, Wei Baolong, Jiao Kai, et al. Research and practice of excavation and support technology for large underground caverns: case of Yangfanggou Hydropower Station[J]. Yangtze River, 2018, 49(24): 76-82. (in Chinese))
[9] 董家兴, 徐光黎, 李志鹏, 等. 高地应力条件下大型地下洞室群围岩失稳模式分类及调控对策[J]. 岩石力学与工程学报, 2014, 33(11): 2161-2170. (Dong Jiaxing, Xu Guangli, Li Zhipeng, et al. Classification of failure modes and controlling measures for surrounding rock of large-scale caverns with high geostress[J]. Chinese Journal of Rock Mechanics and Engineering, 2014, 33(11): 2161-2170. (in Chinese))
[10] 陈雪万, 王强. 白鹤滩水电站竖井滑模混凝土施工测量控制研究[J]. 中国水利, 2019(18): 74-76.(Chen Xuewan, Wang Qiang. Measurement and quality control for slip-form technology in shaft concrete construction of Baihetan Hydropower Station[J]. China Water Resources, 2019(18): 74-76. (in Chinese))
[11] Lin P, Zhou Y N, Liu H Y, et al. Reinforcement design and stability analysis for large-span tailrace bifurcated tunnels with irregular geometry[J]. Tunnelling and Underground Space Technology, 2013, 38(9):189-204.
[12] 陈卫忠, 李术才, 朱维申, 等. 急倾斜层状岩体中巨型地下洞室群开挖施工理论与优化研究[J]. 岩石力学与工程学报, 2004, 23(19): 3281-3287. (Chen Weizhong, Li Shucai, Zhu Weishen, et al. Excavation and optimization theory for giant underground caverns constructed in high dipping laminar strata[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(19): 3281-3287. (in Chinese))
[13] 袁乾博, 杨鹏, 王涛, 等. 乌东德水电站左岸地下主厂房围岩支护效果分析[J]. 三峡大学学报(自然科学版), 2020, 42(1): 24-29,35. (Yuan Qianbo, Yang Peng, Wang Tao, et al. Analysis on the effect of surrounding rock support for the main underground powerhouse on the left bank of Wudongde Hydropower Station[J]. Journal of China Three Gorges University (Natural Science Edition), 2020, 42(1): 24-29,35. (in Chinese))
[14] 王克忠, 李仲奎, 王玉培, 等. 大型地下洞室断层破碎带变形特征及强柔性支护机制研究[J]. 岩石力学与工程学报, 2013, 32(12): 2455-2462.(Wang Kezhong, Li Zhongkui, Wang Yupei, et al. Study of strong flexible supporting mechanism and deformation characteristics for fracture zone in large undergrond caverns[J]. Chinese Journal of Rock Mechanics and Engineering, 2013, 32(12): 2455-2462. (in Chinese))
[15] 刘健华, 李俊, 焦凯, 等. 水电站大型竖井施工安全风险控制措施研究[J]. 人民长江, 2018, 49(24): 63-66.(Liu Jianghua, Li Jun, Jiao Kai, et al. Study on safety risk control measures for large shaft construction of hydropower station[J]. Yangtze River, 2018, 49(24): 63-66. (in Chinese))
[16] Lin P, Liu H Y, Zhou W Y. Experimental study on failure behavior of deep tunnels under high in-situ stresses[J]. Tunnelling and Underground Space Technology, 2015, 46: 28-45.
文章导航

/