本文以陇南市东江初级中学综合教学实验楼基坑支护工程为背景,运用PLAXIS对该基坑进行了开挖全过程的数值模拟分析,结合现场实测结果分析了深基坑旋喷桩的加固效果,并与未采用旋喷桩加固的情况进行了对比分析。结果表明:对于长江支流的白龙江II级阶地力学性质差的饱和土地区,采用旋喷桩加固桩间土及坑内土体能够很好地提高桩周土体强度、限制桩顶位移、减小坑外沉降,可使支护桩桩顶水平及竖向位移减小50%,桩身内力减小10%;增加旋喷桩加固长度对限制支护结构变形效果不大,但增加宽度效果明显,可使支护桩桩顶水平位移减小50%以上,但同时存在最优加固宽度;采用旋喷桩的深基坑加固措施安全可靠、经济合理,对该类地区的类似深基坑工程具有参考及借鉴作用。
This paper takes the foundation pit support project of comprehensive teaching experimental building of Dongjiang Junior Middle School in Longnan City as the background. The whole excavation process of the foundation pit was simulated by PLAXIS and combined with the field measurement results, the reinforcement effect of rotary jet grouting pile in deep foundation pit is analyzed and compared with that without rotary jet grouting pile. The results show that for the saturated soil areas with poor mechanical properties of grade II terrace in the Bailong River tributary of the Yangtze River, using jet grouting pile to reinforce soil between piles and soil in pits can improve the strength of soil around piles, limit the displacement of pile top and reduce the settlement outside pits. It can reduce the horizontal and vertical displacement of the top of the supporting pile by 50%, and the internal force of the pile body by 10%; It is proved that increasing the reinforcement length of the jet grouting pile has little effect on limiting the deformation of supporting structure but the effect of increasing the width is obvious, which can reduce the horizontal displacement of the support pile top by more than 50%. There is also an optimal reinforcement width. Reinforcement measures of deep foundation pit by jet grouting pile are safe reliable and economically rational, which can be used for reference for similar deep foundation pit projects in this kind of area.
[1] 张玉成, 杨光华, 胡海英, 等. 多种支护形式在超大深基坑工程设计中的组合应用[J]. 岩土工程学报, 2014, 36(增2): 198-204.
[2] 周勇, 朱彦鹏. 兰州地区深基坑支护技术探讨[J]. 兰州理工大学学报, 2007, 33(5): 109-113.
[3] 孙浩, 郭浩天. 深基坑支护新技术现状及展望[J]. 建筑科学与工程学报, 2018, 35(3): 104-117.
[4] 中华人民共和国住房和城乡建设部.建筑基坑支护技术规程(JGJ 120—2012)[S]. 北京:中国建筑工业出版社, 2012.
[5] 陈昆, 闫澍旺, 孙立强, 等. 开挖卸荷状态下深基坑变形特性研究[J]. 岩土力学, 2016, 37(4): 1075-1082.
[6] 叶帅华, 丁盛环, 龚晓南, 等. 兰州某地铁车站深基坑监测与数值模拟分析[J]. 岩土工程学报, 2018, 40(增1): 177-182.
[7] 刘国彬, 王卫东. 基坑工程手册(第二版)[M]. 北京: 中国建筑工业出版社, 2009.
[8] 居玥辰, 宫全美, 赵昱, 等. 软土基坑开挖引起地下连续墙水平变形的能量法[J]. 地下空间与工程学报, 2021, 17(6): 1762-1774.
[9] 刘溢, 李镜培, 陈伟. 被动区深层搅拌桩加固对超大深基坑变形的影响[J]. 岩土工程学报, 2012, 34(增1): 465-469.
[10] 郑俊杰, 章荣军, 丁烈云, 等. 基坑被动区加固的位移控制效果及参数分析[J]. 岩石力学与工程学报, 2010, 29(5): 1042-1051.
[11] 寿旋, 徐肖华, 孙苗苗, 等. 软土地区深基坑被动土体加固高度改进研究[J]. 岩土工程学报, 2010, 32(增1): 104-108.
[12] 李志伟, 侯伟生, 叶爱丽, 等. 深基坑开挖段被动区加固的位移控制效果分析[J]. 岩土工程学报, 2012, 34(增1): 621-627.
[13] 屈若枫, 马郧, 徐光黎, 等. 基坑被动区阶梯式加固尺寸对桩位移影响分析[J]. 长江科学院院报, 2013, 30(7): 86-90, 100.
[14] 李承超, 周爱兆, 张静玉, 等. 阶梯断面组合排桩支护结构桩间土加固效果研究[J]. 地下空间与工程学报, 2017, 13(增1): 251-256.
[15] 许健, 杨少飞, 吴海洋, 等. 黄土地区深大基坑桩锚支护结构监测与数值分析[J]. 西安建筑科技大学学报(自然科学版), 2019, 51(4): 517-524.