[1]刘泉声,刘建平,潘玉丛,等.硬岩隧道掘进机性能预测模型研究进展[J].岩石力学与工程学报, 2016, 35(增1): 2766-2786. (Liu Quansheng, Liu Jianping, Pan Yucong, et al. Research advances of tunnel boring machine performance prediction models for hard rock [J]. Chinese Journal of Rock Mechanics and Engineering, 2016, 35(Supp.1): 2766-2786. (in Chinese))
[2]杨泰春,陶建峰,余宏淦,等.基于长短时记忆网络的盾构机刀盘扭矩实时预测[J].地下空间与工程学报, 2020, 16(6): 1801-1808. (Yang Taichun, Tao Jianfeng, Yu Honggan, et al. Real-time prediction of cutter head torque of shield machine based on SHORT and long time memory network[J]. Chinese Journal of Underground Space and Engineering, 2020, 16(06): 1801-1808. (in Chinese))
[3]Ozdemir L. Development of theoretical equations for predicting tunnel borability[D]. Golden: Colorado School of Mines, 1977.
[4]Bruland A. Hard Rock Tunnel Boring[D]. Trondheim, Norway: Norwegian University of Science and Technology (NTNU),1998.
[5]Barton N R. TBM tunnelling in jointed and faulted rock[M]. Boca Raton:CRC Press, 2000.
[6]Bieniawski Z T, Celada A B, Galera J M. TBM Excavability: prediction and machine-rock interaction[A]// Proceedings of RETC, Toronto[C]. 2007: 1118-1130.
[7]Cassinelli F, Cina S, Innaurato N. Power consumption and metal wear in tunnel-boring machines: analysis of tunnel boring operation in hard rock[A]// Proceedings of Tunneling '82, Papers Presented at the 3rd International Symposium. London: IMM[C]. 1982: 73-81.
[8]Minh V T, Katushin D, Antonov M, et al. Regression models and fuzzy logic prediction of TBM penetration rate[J]. Open Engineering, 2017, 7(1): 60-68.
[9]Jamshidi A. Prediction of TBM penetration rate from brittleness indexes using multiple regression analysis[J]. Modeling Earth Systems and Environment, 2018, 4(1): 383-394.
[10]Afradi A, Ebrahimabadi A, Hallajian T. Prediction of TBM penetration rate using fuzzy logic, particle swarm optimization and harmony search algorithm[J]. Geotechnical and Geological Engineering, 2022,40(3): 1513-1536.
[11]王健,王瑞睿,张欣欣,等.基于RMR岩体分级系统的TBM掘进性能参数预测[J].隧道建设, 2017, 37(6): 700-707. (Wang Jian, Wang Ruirui, Zhang Xinxin, et al. Estimation of TBM performance parameters based on rock mass rating(RMR) system [J]. Tunnel Construction, 2017, 37(6): 700-707. (in Chinese))
[12]闫长斌,姜晓迪.基于岩体指标和掘进参数的TBM净掘进速率预测模型[J].现代隧道技术, 2020, 57(2): 26-33. (Yan Changbin, Jiang Xiaodi. Prediction model of TBM net advance rate based on parameters of rock mass and tunnelling [J]. Modern Tunnelling Technology, 2020, 57(2): 26-33. (in Chinese))
[13]宋克志,孙谋.复杂岩石地层盾构掘进效能影响因素分析[J].岩石力学与工程学报, 2007, 26(10): 2092-2096.(Song Kezhi, Sun Mou. Analysis of influencing factors of shield tunneling performance in complex rock strata [J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(10): 2092-2096. (in Chinese))
[14]杜立杰,齐志冲,韩小亮,等.基于现场数据的TBM可掘性和掘进性能预测方法[J].煤炭学报, 2015, 40(6): 1284-1289. (Du Lijie, Qi Zhichong, Han Xiaoliang, et al. Prediction method for the boreability and performance of hard rock TBM based on boring data on site [J]. Journal of China Coal Society, 2015, 40(6): 1284-1289. (in Chinese))
[15]闫长斌,杜旭阳,戴晓亚,等.基于围岩力学参数的TBM净掘进速率多元回归预测模型[J].隧道建设(中英文), 2019, 39(1): 48-53.(Yan Changbin, Du Xuyang, Dai Xiaoya, et al. Multiple regression prediction model for TBM net boring rate based on mechanical parameters of surrounding rock [J]. Tunnel Construction, 2019, 39(1): 48-53. (in Chinese))
[16]侯少康,刘耀儒,张凯.基于IPSO-BP混合模型的TBM掘进参数预测[J].岩石力学与工程学报, 2020, 39(8): 1648-1657. (Hou Shaokang, Liu Yaoru, Zhang Kai. Prediction of TBM tunnelling parameters based on IPSO-BP hybrid model [J]. Chinese Journal of Rock Mechanics and Engineering, 2020, 39(8): 1648-1657. (in Chinese))
[17]Hassanpour J, Rostami J, Zhao J. A new hard rock TBM performance prediction model for project planning[J]. Tunnelling and Underground Space Technology, 2011, 26(5): 595-603.
[18]吴鑫林,张晓平,刘泉声,等.TBM岩体可掘性预测及其分级研究[J].岩土力学, 2020, 41(5): 1721-1729, 1739.(Wu Xinlin, Zhang Xiaoping, Liu Quansheng, et al. Prediction and classification of rock mass boreability in TBM tunnel[J]. Rock and Soil Mechanics, 2020, 41(5): 1721-1729, 1739. (in Chinese))
[19]Khademi H J, Shahriar K, Rezai B, et al. Performance prediction of hard rock TBM using rock mass rating(RMR) system[J]. Tunnelling and Underground Space Technology, 2010, 25(4): 333-345.
[20]薛亚东,李兴,刁振兴,等.基于掘进性能的TBM施工围岩综合分级方法[J].岩石力学与工程学报, 2018, 37(增1): 3382-3391. (Xue Yadong, Li Xing, Diao Zhenxing, et al. A novel classification method of rock mass for TBM tunnel based on penetration performance [J]. Chinese Journal of Rock Mechanics and Engineering, 2018, 37(Supp.1): 3382-3391. (in Chinese))
[21]Ren Q, Zhang H B, Zhang D L, et al. A novel hybrid method of lithology identification based on k-means++ algorithm and fuzzy decision tree[J]. Journal of Petroleum Science and Engineering,2022, 208(D):109681
[22]陶莹,杨锋,刘洋,等. K-均值聚类算法的研究与优化[J].计算机技术与发展, 2018, 28(6): 90-92. (Tao Ying, Yang Feng, Liu Yang, et al. Research and optimization of K-means clustering algorithm [J]. Computer Technology and Development, 2018, 28(6): 90-92. (in Chinese))
[23]李集,戎晓力,卢浩,等.深埋长大隧道突水突泥风险后果评价模型研究[J].地下空间与工程学报,2016,12(3):810-818.(Li Ji,Rong Xiaoli,Lu Hao,et al.Researchon the comprehensive evaluation model of water inrush and mud outburst risk consequences for deeply buried long and large tunnel[J].Chinese Journal of Underground Space and Engineering,2016,12(3):810-818.(in Chinese))
[24]史秀志,黄敏,周健,等.工程岩体质量等级判别的未确知均值聚类法[J].地下空间与工程学报,2010,6(6):1168-1173,1214.(Shi Xiuzhi,Hunag Min,Zhou Jian,et al.Assessment of classification of engineering rock mass quality based on uncertainty average clustering measurement method[J].Chinese Journal of Underground Space and Engineering,2010,6(6):1168-1173,1214.(in Chinese))
[25]Parsajoo M, Mohammed A S, Yagiz S, et al. An evolutionary adaptive neuro-fuzzy inference system for estimating field penetration index of tunnel boring machine in rock mass[J]. Journal of Rock Mechanics and Geotechnical Engineering, 2021, 13(6): 1290-1299.
[26]Yagiz S. New equations for predicting the field penetration index of tunnel boring machines in fractured rock mass[J]. Arabian Journal of Geosciences, 2017, 10(2): 1-13.
[27]Parsajoo M, Mohammed A S, Yagiz S, et al. An evolutionary adaptive neuro-fuzzy inference system for estimating field penetration index of tunnel boring machine in rock mass[J]. Journal of Rock Mechanics and Geotechnical Engineering, 2021, 13(6): 1290-1299.
[28]Zhang X P, Xie W Q, Liu Q S, et al. Development and application of an in-situ indentation testing system for the prediction of tunnel boring machine performance[J]. International Journal of Rock Mechanics and Mining Sciences, 2021, 147: 104899.
[29]Nelson P, O'Rourke T D, Kulhawy F H. Factors affecting TBM penetration rates in sedimentary rocks[A]// The 24th US Symposium on Rock Mechanics (USRMS). OnePetros[C]. 1983:227- 237.
[30]Hassanpour J, Rostami J, Khamehchiyan M, et al. TBM performance analysis in pyroclastic rocks: a case history of Karaj water conveyance tunnel[J]. Rock Mechanics and Rock Engineering, 2010, 43(4): 427-445.
[31]余志刚.泥质粉砂岩地层泥水盾构掘进参数变化规律及关联性分析[J].施工技术, 2018, 47 (1): 116-121.(Yu Zhigang. Change rule and correlation analysis of slurry shield tunneling parameters under argillaceous siltstone formation [J]. Construction Technology, 2018, 47(1): 116-121. (in Chinese))